Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD02-02748
StatusFinaled
Name RODEWAY INN
Site Address 1115 N CURTIS RD
Project NameRodeway Inn
Customer Number 
ePlanReviewNo
Description
(RODEWAY INN) To perform code upgrade remodel of existing facility to provide 4-hour area separation wall repair and installation of 3-hour fire door assembly at 1st & second floor cross-corridor locations; to provide 1-hour fire-resistive constructuion of under stair storage areas; modification of doors to under stair storage areas to swing under the stairs, be 20 minute door frame assemblies in compliance with current code for "S" label / & rating for door, frame & hardware; alter existing opening into storage room located by pool and install 20 minute door assembly per code and infill remaining opening with 1-hour corridor construction materials; and to construct new 1-hour corridor walls & 20 minute door assembly at top landing of north end stairs to be create a new storage room. Firestop all penetrations of fire-walls with listed assemblies for materials penetrated and with same fire-rating as assembly penetrated. Verify door hardware complies with section 1003.3.1.8, '97 UBC (same as 3303(c), 1970 UBC), to include on gate at pool Cabana. A "Letter of Completion / compliance" required as condition of permit. PC#02-714/drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  8/16/2013 DONE
DetailsTisha Gallop
project passed all final inspections and should NOT have been "doc-expired".
BLD-Aging Inspection1/13/20041/13/20041/13/2004 CANC
DetailsTom Arcoraci
BLD-Aging Inspection10/16/200310/16/200310/16/2003 PASS
DetailsTom Arcoraci
BLD-Final8/14/20038/14/20038/14/2003PPASS
DetailsTom Arcoraci
carlos; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Final8/11/20038/13/20038/13/2003PNR
DetailsTom Arcoraci
BRUCE-- ###-####
FIRE-Final Inspection8/13/20038/13/20038/13/2003PPASS
DetailsTroy Cobbley
Fire life safety finaled 8/14/2003 10:23:24 AM
BLD-Final6/30/20037/2/20037/2/2003ANR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 6/30/2003 at 11:13:18 AM. 7/2/2003 9:08:45 AM needs fire insp 7/2/2003 9:56:31 AM
FIRE-Final Inspection6/30/20037/2/20037/2/2003AFAIL
DetailsTroy Cobbley
The two fire doors have magnetic door hold opens to keep them open. These door hold opens have been installed and connected to the existing fire alarm system by the hotel maintenance staff. I met with the hotel manager and told him that to connect the devices to the facp panel permits will need to be aquired or remove the hold opens and allow the hydraulic closers to keep the doors shut. I spoke with Sam Rogers about this project 7/2/2003 10:57:13 AM
BLD-Aging Inspection3/24/20033/24/20033/24/2003 PART
DetailsTom Arcoraci
wip 3/24/03 11:31:14 AM