BLD-Final | 5/20/2003 | 5/21/2003 | 5/21/2003 | P | PASS |
Jim Storey
|
|
|
jack; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
FIRE-Final Inspection | 5/20/2003 | 5/21/2003 | 5/21/2003 | A | PASS |
Rick Jackson
|
|
|
jack; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
Permanent Occupancy | | 5/21/2003 | 5/21/2003 | | DONE |
|
|
|
|
FIRE-Final Inspection | 5/15/2003 | 5/15/2003 | 5/15/2003 | P | FAIL |
Rick Jackson
|
|
|
called Pat and told him the wiring not supported above ceiling 5/15/2003 3:45:16 PM
|
BLD-Aging Inspection | 5/6/2003 | 5/6/2003 | 5/6/2003 | | PART |
Jim Storey
|
|
|
fire wip per rj 5/6/2003 8:13:36 AM
|
BLD-Conference | 3/6/2003 | 3/6/2003 | 3/6/2003 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/6/2003 at 10:45:25 AM. Contact: ###-####. final ok. pending dave miller sign off. 3/7/2003 8:42:52 AM 3/7/2003 8:51:08 AM
|
BLD-Final | 2/13/2003 | 2/14/2003 | 2/14/2003 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/13/2003 at 10:42:56. Contact: ###-####.remove carpet from walls and finsh fire insp. from temp to perm. 2/14/2003 2:32:43 PM
|
FIRE-Final Inspection | 2/13/2003 | 2/13/2003 | 2/13/2003 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 02/13/2003 at 10:41:13. Contact: ###-####. approved for temp occupancy per Dave Miller pending submittal/approval and testing of duct detectors tied to exsisting sprinkler monitoring alarm panel 2/13/2003 4:04:23 PM
|
BLD-Framing/Rough-in | 2/7/2003 | 2/10/2003 | 2/10/2003 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 2/7/2003 at 2:29:39 PM. Contact: ###-####.ceilling ok 2/10/2003 9:32:41 AM
|
FIRE-Sprinkler Rough-in | 2/7/2003 | 2/7/2003 | 2/7/2003 | P | PASS |
Rick Jackson
|
|
|
okay to cover fire sprinklers; told GC about requirements for submitting fire alarm plans for duct detectors and for panic on second exit; will remove doors on east side as shown on plans; occupant load sign per plans
|
BLD-Other | 2/3/2003 | 2/4/2003 | 2/4/2003 | P | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/03/2003 at 10:21:50. Contact: ###-####.wip 2/4/2003 2:48:34 PM
|
BLD-Framing/Rough-in | 1/8/2003 | 1/9/2003 | 1/9/2003 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/08/2003 at 14:54:35. Contact: ###-####.framing ok to cover / storage rm door swing wrong way can check at final. 1/9/2003 9:40:20 AM
|