BLD-Final | 6/23/2003 | 6/23/2003 | 6/23/2003 | P | PASS |
Jim Sly
|
|
|
###-#### OK for Perm. Occ. :) 6/24/2003 2:39:45 PM
|
BLD-Framing/Rough-in | 5/28/2003 | 5/30/2003 | 5/30/2003 | P | PART |
Jim Sly
|
|
|
terry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore SHOULD BE FINAL....... OK for Temp.....C/N Need landscape and Electr sign-off for Perm Occ, Ext completed and address #'s installed. 5/30/2003 3:58:37 PM
|
FIRE-Final Inspection | 5/28/2003 | 5/30/2003 | 5/30/2003 | A | PASS |
Troy Cobbley
|
|
|
terry; Phone #: ###-#### Fire life safety finaled. Building inspector to verify address has been installed 5/30/2003 12:29:10 PM
|
BLD-Framing/Rough-in | 5/13/2003 | 5/13/2003 | 5/13/2003 | P | PASS |
Jim Sly
|
|
|
CEILING GRID-- TERRY ###-####
|
BLD-Framing/Rough-in | 4/8/2003 | 4/9/2003 | 4/9/2003 | A | PASS |
Jim Sly
|
|
|
terry; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 3/27/2003 | 3/28/2003 | 3/28/2003 | P | PART |
Dave Hannah
|
|
|
partial \\###-#### steel studs mec and control room ok to sheet rock one side 3/28/2003 5:09:58 PM
|
BLD-Framing/Rough-in | 3/20/2003 | 3/20/2003 | 3/20/2003 | P | PART |
Jim Sly
|
|
|
###-#### Shear OK. 3/20/2003 3:46:41 PM
|
BLD-Conference | 3/10/2003 | 3/11/2003 | 3/11/2003 | A | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Concrete | 2/21/2003 | 2/24/2003 | 2/24/2003 | A | PASS |
Jim Sly
|
|
|
###-#### terry slab. 2/24/2003 12:37:38 PM
|
BLD-Concrete | 2/20/2003 | 2/21/2003 | 2/21/2003 | A | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Concrete | 2/20/2003 | 2/20/2003 | 2/20/2003 | P | PART |
Jim Sly
|
|
|
terry; Phone #: ###-#### Internet Inspection Request from: Annette Moore Vault floor and columns. 2/20/2003 1:19:24 PM
|
BLD-Footing | 2/11/2003 | 2/12/2003 | 2/12/2003 | A | PASS |
Jim Sly
|
|
|
concrete scheduled for 12 ###-#### all footings and pads....OK. 2/12/2003 9:46:45 AM
|
BLD-Foundation | 2/10/2003 | 2/11/2003 | 2/11/2003 | P | PASS |
Jim Sly
|
|
|
###-#### Found wall pass......Letter from Stapley Eng. Greg Toolson.....Design concrete 2500psi No special insp Req. 2/11/2003 1:53:24 PM
|
BLD-Footing | 2/6/2003 | 2/7/2003 | 2/7/2003 | P | PART |
Jim Sly
|
|
|
###-#### ###-#### 90% footing complete....OK pending insp and approval MTI 2/7/2003 3:14:38 PM
|