BLD-Final | 4/9/2003 | 4/11/2003 | 4/11/2003 | A | PASS |
Jim Storey
|
|
|
###-####
|
BLD-Energy code compliance | 2/17/2003 | 2/18/2003 | 2/18/2003 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 2/17/2003 at 1:09:16 PM. Contact: ###-####.c/n made ok. 2/18/2003 10:14:29 AM
|
BLD-Energy code compliance | 2/14/2003 | 2/14/2003 | 2/14/2003 | P | FAIL |
Jim Storey
|
|
|
provide ul listing for instalation of oval b-vent in 2nd floor wall cavity for verifacation of instaltion per listing. 2/14/2003 3:02:14 PM
|
BLD-Framing/Rough-in | 2/14/2003 | 2/14/2003 | 2/14/2003 | P | FAIL |
Jim Storey
|
|
|
###-#### ###-#### c/n standing check engery insp for full verbage to issue. 2/14/2003 3:04:20 PM
|
BLD-Framing/Rough-in | 2/12/2003 | 2/13/2003 | 2/13/2003 | A | FAIL |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoungc/n stands. 2/13/2003 4:26:56 PM
|
BLD-Framing/Rough-in | 2/10/2003 | 2/11/2003 | 2/11/2003 | A | FAIL |
Dave Hannah
|
|
|
TERRY; Phone #: ###-#### Internet Inspection Request from: Darla Downs c/n on site ok to insulate 2/11/2003 11:49:36 AM
|
BLD-Wall cover | 1/15/2003 | 1/16/2003 | 1/16/2003 | A | PART |
Carl Dependahl
|
|
|
ext nailing ok 1/16/2003 11:11:18 AM
|
BLD-Framing/Rough-in | 1/14/2003 | 1/15/2003 | 1/15/2003 | A | CANC |
Jim Storey
|
|
|
###-#### terry
|
BLD-Foundation | 12/20/2002 | 12/23/2002 | 12/23/2002 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/20/2002 at 06:48:36. Contact: ###-####.wip 12/23/2002 8:47:22 AM
|
BLD-Footing | 12/20/2002 | 12/20/2002 | 12/20/2002 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/20/2002 at 06:47:47. Contact: ###-####.
|