BLD-Final | 4/9/2003 | 4/10/2003 | 4/10/2003 | P | PASS |
Jim Storey
|
|
|
TERRY; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Energy code compliance | 2/12/2003 | 2/12/2003 | 2/12/2003 | P | PASS |
Jim Storey
|
|
|
###-#### terry
|
BLD-Energy code compliance | 2/7/2003 | 2/7/2003 | 2/7/2003 | P | CANC |
Jim Storey
|
|
|
###-####--cancel per terry wrong bld #
|
BLD-Framing/Rough-in | 2/6/2003 | 2/6/2003 | 2/6/2003 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/06/2003 at 06:05:27. Contact: ###-####. c/n mad ok interior sheer ok behind furn engineering recieved and instaled with insulation in wall ok. 2/6/2003 11:57:41 AM
|
BLD-Framing/Rough-in | 1/31/2003 | 2/3/2003 | 2/3/2003 | P | PART |
Jim Storey
|
|
|
###-#### c/n ok to insulate/ trusses. 2/3/2003 5:11:23 PM
|
BLD-Framing/Rough-in | 1/14/2003 | 1/16/2003 | 1/16/2003 | P | PART |
Jim Storey
|
|
|
###-#### terry ###-#### terry exterior ok for cover. 1/16/2003 3:28:39 PM
|
BLD-Foundation | 12/20/2002 | 12/20/2002 | 12/20/2002 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/20/2002 at 06:46:51. Contact: ###-####.setbacks ok poured without inspection 12/20/2002 9:07:55 AM
|
BLD-Footing | 12/18/2002 | 12/18/2002 | 12/18/2002 | P | PART |
Steven Webb
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung WIP--rear setback not per approved plans--contractor will move forward to achieve the required 15' at rear--5% ready at time of inspection. Verfiy rear setback at foundation inspection. 12/18/2002 1:15:22 PM
|