BLD-Final | 5/15/2003 | 5/16/2003 | 5/16/2003 | A | PASS |
Dave Hannah
|
|
|
chris; Phone #: ###-#### Internet Inspection Request from: Barbara Moore c.c # 22916 issued 5/16/2003 10:47:56 AM
|
BLD-Final | 5/15/2003 | 5/15/2003 | 5/15/2003 | P | CANC |
Steven Webb
|
|
|
RE-INSP -CHRIS; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Cancelled by contractor 5/15/2003 4:16:58 PM
|
BLD-Final | 5/14/2003 | 5/14/2003 | 5/14/2003 | P | FAIL |
Dave Hannah
|
|
|
chris; Phone #: ###-#### Internet Inspection Request from: Barbara Moore c/n on site 5/14/2003 2:37:38 PM
|
BLD-Energy code compliance | 2/24/2003 | 2/24/2003 | 2/24/2003 | P | PASS |
Jim Storey
|
|
|
###-#### chris
|
BLD-Framing/Rough-in | 2/20/2003 | 2/21/2003 | 2/21/2003 | P | PASS |
Dave Hannah
|
|
|
###-#### chris ok to insulate 2/21/2003 10:55:43 AM
|
BLD-Framing/Rough-in | 2/20/2003 | 2/20/2003 | 2/20/2003 | P | FAIL |
Dave Hannah
|
|
|
###-#### looked at framing with contractor but no truss engineering on site no inspection done at this time 2/20/2003 5:15:09 PM
|
BLD-Framing/Rough-in | 2/19/2003 | 2/19/2003 | 2/19/2003 | P | FAIL |
Dave Hannah
|
|
|
chris; Phone #: ###-#### Internet Inspection Request from: Annette Moore needs mec and plumbing r/i completed also needs a seal package installed no inspection done at this time 2/19/2003 1:41:56 PM
|
BLD-Framing/Rough-in | 2/11/2003 | 2/11/2003 | 2/11/2003 | P | PART |
Dave Hannah
|
|
|
###-#### shear ok to cover ext 2/11/2003 1:37:55 PM
|
BLD-Foundation | 1/7/2003 | 1/7/2003 | 1/7/2003 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/07/2003 at 08:00:05. Contact: ###-####.
|
BLD-Footing | 1/6/2003 | 1/6/2003 | 1/6/2003 | P | PASS |
Jim Storey
|
|
|
###-####
|