BLD-Final | 2/6/2003 | 2/7/2003 | 2/7/2003 | A | FAIL |
Tony Young
|
|
|
c/n on mech. and building 2/7/2003 12:11:14 PM
|
BLD-Final | 2/7/2003 | 2/7/2003 | 2/7/2003 | P | PASS |
Carl Dependahl
|
|
|
|
BLD-Conference | 1/21/2003 | 1/21/2003 | 1/21/2003 | P | PASS |
Carl Dependahl
|
|
|
need 26 ga duct through firewall or lid ( or equiv.)
|
BLD-Energy code compliance | 1/16/2003 | 1/17/2003 | 1/17/2003 | A | PASS |
Carl Dependahl
|
|
|
###-####...ok to cover 1/17/2003 9:22:47 AM
|
BLD-Framing/Rough-in | 1/14/2003 | 1/15/2003 | 1/15/2003 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/14/2003 at 15:32:32. Contact: ###-####.
|
BLD-Conference | 1/7/2003 | 1/7/2003 | 1/7/2003 | A | PASS |
Carl Dependahl
|
|
|
need to patch-fill fnd wall blockouts thru to exterior, add retro-fit hd's at brace panels...infill garage hse wall opening ( solid 2 wythe brick, may delete 5/8" gypsum at wall only...)
|
BLD-Other | 1/6/2003 | 1/7/2003 | 1/7/2003 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/06/2003 at 15:22:51. Contact: ###-####....ext nailing ok, need to add hold downs in pairs as shown. 1/7/2003 1:09:20 PM
|
BLD-Footing | 12/19/2002 | 12/20/2002 | 12/20/2002 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 12/19/2002 at 15:50:26. Contact: ###-####.
|