Permit Information
Permit NumberBLD02-03023
StatusFinaled
Name HOWELL KEVIN A
Site Address 4900 N ROSEPOINT WAY
Project NameKevin Howell
Customer Number 
ePlanReviewNo
Description
(Building "C")-To construct a one-story, Type VN office shell only building with a total of 5,032 sq.ft. The building is proposed to have 4 separate tenant spaces. Other work includes all site improvements, paving and landscaping per approved plans and attachments, CUP00-00076 No Occupancy is authorized under this permit. Separate plans and permits are required for each tenant space.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/24/20056/28/20056/29/2005APASS
DetailsJim Sly
dave williams-- ###-####
OK for Perm Occ.
BLD-Energy code compliance2/2/20052/3/20052/3/2005APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 2/2/2005 at 5:45:53 PM. Contact: ###-####.
BLD-Energy code compliance12/21/200412/21/200412/21/2004PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/21/2004 at 8:48:45 AM. Contact: ###-####.
BLD-Framing/Rough-in12/14/200412/15/200412/15/2004PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/14/2004 at 5:17:12 PM. Contact: ###-####. Contractor wants to do restrooms with each T I Told him that I would like to get the shell permit to a Temp Occ status B 4 any other T I's final.....Will Temp all Permits until all restrooms in (which are on the shell permit) 12/15/2004 4:28:51 PM
BLD-Framing/Rough-in12/14/200412/14/200412/14/2004PCANC
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/14/2004 at 11:26:48 AM. Contact: ###-####.
FIRE-Final Inspection11/8/200411/8/200411/8/2004APASS
DetailsTroy Cobbley
Life safety finaled
BLD-Conference11/5/200411/5/200411/5/2004ADONE
DetailsTroy Cobbley
I notified the tenant improvement contractor, Gary, that I could not give him a final on the tenant improvement since the shell pemit had never been finaled and was infact expired. After discussing this with Linda and George Slane I told him he needs to contact plan review on reinstating the permit
Extend Permit 180 days 11/5/200411/5/2004 DONE
LINDA & MARLENE----REOPENED PERMIT THEY ARE WORKING ON TI's.
BLD-Framing/Rough-in2/20/20042/23/20042/23/2004PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 2/20/2004 at 8:37:14 AM. Contact: ###-####. Shear OK. 2/23/2004 4:30:12 PM
BLD-Foundation11/4/200311/4/200311/4/2003PPASS
DetailsTom Arcoraci
manuel; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Footing11/3/200311/3/200311/3/2003PPASS
DetailsJim Sly
manual; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie