BLD-Final | 4/23/2003 | 4/24/2003 | 4/24/2003 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/23/2003 at 5:03:38 PM. Contact: ###-####. C/C issued. 4/24/2003 11:37:10 AM
|
BLD-Framing/Rough-in | 3/5/2003 | 3/5/2003 | 3/5/2003 | P | PASS |
Jim Sly
|
|
|
WAYNE; Phone #: ###-#### Internet Inspection Request from: Darla Downs Energy OK. 3/5/2003 5:05:57 PM
|
BLD-Framing/Rough-in | 2/26/2003 | 2/26/2003 | 2/26/2003 | P | FAIL |
Jim Sly
|
|
|
WAYNE; Phone #: ###-#### Internet Inspection Request from: Darla Downs Complete items on corr notice. 2/26/2003 12:50:54 PM
|
BLD-Framing/Rough-in | 2/19/2003 | 2/21/2003 | 2/21/2003 | A | FAIL |
Jim Sly
|
|
|
###-#### C/N 2/21/2003 10:06:57 AM
|
FIRE-Sprinkler Rough-in | 2/10/2003 | 2/10/2003 | 2/10/2003 | P | CANC |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 2/10/2003 at 8:05:28 AM. Contact: ###-####. 2/10/03-Troy called about this inspection, we think the GC entered the wrong inspection. I called GC and left mesg. that he would need to set up a new inspection or give me a call. lh
|
BLD-Framing/Rough-in | 2/3/2003 | 2/3/2003 | 2/3/2003 | P | PART |
Jim Sly
|
|
|
###-#### wayne sheer panel Shear OK. 2/3/2003 12:51:13 PM
|
BLD-Foundation | 1/22/2003 | 1/22/2003 | 1/22/2003 | P | PASS |
Jim Sly
|
|
|
logan - ###-####
|
BLD-Footing | 1/21/2003 | 1/21/2003 | 1/21/2003 | P | PART |
Jim Sly
|
|
|
###-####
|