Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD03-00100
StatusFinaled
Name WASHINGTON MUTUAL (TRAINING ROOM)
Site Address 175 N CAPITOL BLVD Unit: 2 FLR
Project NameWASHINGTON MUTUAL BLDG
Customer Number 
ePlanReviewNo
Description
(WASHINGTON MUTUAL - TRAINING ROOM - 2ND FLR) This building is fire sprinklered because it is a high-rise. To create a 1,310 square foot training room within an existing 10,728 square foot tenant space located on the 2nd floor of an 11 story, 112,000 square foot building. Work is to include interior nonbearing walls, interior doors, and light switches all per approved drawings and plan review conditions on file. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection6/15/20046/15/20046/15/2004 PASS
DetailsDave Hannah
BLD-Final5/2/20035/5/20035/5/2003APASS
DetailsCarl Dependahl
Double check for a final; ok for c/o. 5/5/2003 1:49:43 PM
BLD-Final3/11/20033/12/20033/12/2003ANR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 3/11/2003 at 6:20:41 PM. Contact: ###-####...need fire & elec 3/12/2003 11:35:56 AM
BLD-Final3/12/20033/12/20033/12/2003PNR
DetailsCarl Dependahl
need fire 3/12/2003 4:56:54 PM
FIRE-Final Inspection3/11/20033/12/20033/12/2003AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 3/11/2003 at 6:22:19 PM. Contact: ###-####. fire sprinklers overspaced at east side of new wall; need to verify candela rating of horn/strobe intraining room - minimum of 110 cd needed 3/12/2003 2:47:28 PM
BLD-Framing/Rough-in3/5/20033/6/20033/6/2003PPASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 3/5/2003 at 9:14:51 PM.