BLD-Final | 7/31/2003 | 8/1/2003 | 8/1/2003 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/31/2003 at 9:08:28 PM. Contact: ###-####. c.c# 23950 issued 8/1/2003 9:18:03 AM
|
BLD-Final | 7/28/2003 | 7/29/2003 | 7/29/2003 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/28/2003 at 6:22:12 PM. Contact: ###-####. needs mec final and landings or hand rails at doors in garage 7/29/2003 10:11:19 AM
|
BLD-Energy code compliance | 5/14/2003 | 5/14/2003 | 5/14/2003 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 5/14/2003 at 9:29:56 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 5/14/2003 | 5/14/2003 | 5/14/2003 | P | PASS |
Jim Storey
|
|
|
c/n made ok
|
BLD-Framing/Rough-in | 5/12/2003 | 5/13/2003 | 5/13/2003 | A | PART |
Jim Storey
|
|
|
t 32 east bed room truss brace noted on engineering. t 28 brace or need engineering. ok to insulate. 5/13/2003 10:44:15 AM
|
BLD-Framing/Rough-in | 5/12/2003 | 5/12/2003 | 5/12/2003 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 5/12/2003 at 10:07:15 AM. Contact: ###-####. out of time. 5/12/2003 5:23:45 PM
|
BLD-Framing/Rough-in | 4/22/2003 | 4/23/2003 | 4/23/2003 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 4/22/2003 at 9:08:36 AM. Contact: ###-####.exterior ok for cover. 4/23/2003 3:08:18 PM
|
BLD-Foundation | 2/26/2003 | 2/26/2003 | 2/26/2003 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/26/2003 at 6:16:08 AM. Contact: ###-####.
|
BLD-Footing | 2/24/2003 | 2/24/2003 | 2/24/2003 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 2/24/2003 at 8:46:24 AM. Contact: ###-####.wip soil ok 2/24/2003 2:56:04 PM
|