Permanent Occupancy | | 9/22/2003 | 9/22/2003 | | DONE |
|
|
|
|
BLD-Final | 9/18/2003 | 9/19/2003 | 9/19/2003 | A | PASS |
Tom Arcoraci
|
|
|
DOUG; Phone #: ###-#### Internet Inspection Request from: Marc Lileks ok for temp ok for perm if all others sign perm 9/19/2003 10:09:03 AM
|
FIRE-Final Inspection | 9/19/2003 | 9/19/2003 | 9/19/2003 | P | PASS |
Troy Cobbley
|
|
|
fire life safety, fire alarm and fire sprinkler finaled 9/19/2003 1:00:00 PM
|
FIRE-Final Inspection | 9/17/2003 | 9/17/2003 | 9/17/2003 | P | FAIL |
Rick Jackson
|
|
|
door hardware on meeting room door; canopies on fire sprinklers; laundry room door closure and smoke seal; exit signs and emergency lights okay
|
BLD-Framing/Rough-in | 9/12/2003 | 9/15/2003 | 9/15/2003 | A | PART |
Jim Sly
|
|
|
doug celing grid; Phone #: ###-#### Internet Inspection Request from: Darla Downs Ceiling grid OK. 9/15/2003 11:01:49 AM
|
BLD-Framing/Rough-in | 9/9/2003 | 9/9/2003 | 9/9/2003 | P | FAIL |
Tony Young
|
|
|
DOUG CEILING GRID; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
c/n posted 9/9/2003 4:40:30 PM
|
BLD-Framing/Rough-in | 7/9/2003 | 7/10/2003 | 7/10/2003 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 7/9/2003 at 12:28:05 PM. Contact: ###-####.... ok to cover walls, c/n ok but need fire sprinkler mods inspected 7/10/2003 10:25:49 AM
|
BLD-Framing/Rough-in | 7/2/2003 | 7/3/2003 | 7/3/2003 | P | FAIL |
Carl Dependahl
|
|
|
jose; Phone #: ###-#### Internet Inspection Request from: Annette Moore...need shearwalls(block/nail) per plan...draftstop in attic & ceiling lines, firedampers at boiler room, remove face paper as possible where exposed 7/3/2003 1:18:15 PM
|
BLD-Conference | 6/19/2003 | 6/19/2003 | 6/19/2003 | P | PART |
Tony Young
|
|
|
jose; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
firewall upper mech room ok to cover pending trades,,,,, also ok to cover roof rafters w/ paper back insulation w/ listed foil for fire protection, (for concealment) 6/19/2003 4:52:23 PM
|
BLD-Footing | 5/29/2003 | 5/29/2003 | 5/29/2003 | P | PART |
Tony Young
|
|
|
pier pads
int. hold down ftgs, wip 5/29/2003 2:30:04 PM
|
BLD-Conference | 5/14/2003 | 5/15/2003 | 5/15/2003 | A | PART |
Tony Young
|
|
|
###-#### doug please call before going out go over project w/ contractor,, mainly boiler room and laundry 5/15/2003 11:49:28 AM
|