BLD-Final | 6/30/2003 | 7/1/2003 | 7/1/2003 | A | PASS |
Steven Webb
|
|
|
terry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore C. of C. #23384 7/1/2003 9:57:57 AM
|
BLD-Energy code compliance | 5/8/2003 | 5/9/2003 | 5/9/2003 | A | PASS |
Tom Arcoraci
|
|
|
###-####
|
BLD-Framing/Rough-in | 5/6/2003 | 5/6/2003 | 5/6/2003 | P | PASS |
Steven Webb
|
|
|
###-####--Reviewed Hold Harmless Agreement with Inspector 425, contractor ok to have crawl with vents and foundation insulation. Questions call B. Archibald. Ok to insulate. 5/6/2003 4:17:47 PM
|
BLD-Framing/Rough-in | 5/5/2003 | 5/5/2003 | 5/5/2003 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/5/2003 at 5:29:40 AM. Contact: ###-####. C/N for Un-vented crawl and non comply energy. 5/5/2003 11:17:12 AM
|
BLD-Conference | 5/2/2003 | 5/2/2003 | 5/2/2003 | P | PASS |
Carl Dependahl
|
|
|
keep c/n 5/2/2003 3:20:49 PM
|
BLD-Framing/Rough-in | 5/2/2003 | 5/2/2003 | 5/2/2003 | A | FAIL |
Carl Dependahl
|
|
|
c/n: air seal, nail joists,add brg studs...verify mech ventilation in lieu of floor insul. 5/2/2003 10:43:38 AM
|
BLD-Framing/Rough-in | 4/30/2003 | 5/1/2003 | 5/1/2003 | P | CANC |
Russ Owen
|
|
|
TERRY; Phone #: ###-#### Internet Inspection Request from: Darla Downs Unable to do out of time. 5/2/2003 7:30:34 AM
|
BLD-Framing/Rough-in | 4/14/2003 | 4/14/2003 | 4/14/2003 | P | PART |
Tom Arcoraci
|
|
|
###-#### ok to side 4/14/2003 3:07:12 PM
|
BLD-Foundation | 3/21/2003 | 3/24/2003 | 3/24/2003 | A | PART |
Tom Arcoraci
|
|
|
ADAM; Phone #: ###-#### Internet Inspection Request from: Darla Downs wip ok 3/24/2003 9:33:01 AM
|
BLD-Footing | 3/21/2003 | 3/21/2003 | 3/21/2003 | P | PART |
Tom Arcoraci
|
|
|
adam; Phone #: ###-#### Internet Inspection Request from: Annette Moore wip ok 3/21/2003 2:42:47 PM
|