Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD03-00415
StatusFinaled
Name SERENITY RETREAT
Site Address 2405 N BOGUS BASIN RD
Project NameHIGHLAND CENTER
Customer Number 
ePlanReviewNo
Description
(SERENITY RETREAT)(HIGHLAND CENTER) *6/10/03 - INCIDENTAL USE STORAGE AREAS WERE DELETED FROM SCOPE OF WORK AND ARE NOT A PART OF THIS TENANT SPACE AT THIS TIME. AREAS RECLASSIFIED AS 'FUTURE EXPANSION'. To remodel a 3,640 sq.ft. office building for new service use of 'Day Spa' by installing 5 new interior spa rooms which have tub, sauna and showers; (2) new massage therapy rooms, new laundry, office, reception / waiting & storage areas; and update of mechanical, plumbing & electrical to meet tenant needs and comply with current codes. Approximately 400 sq. ft. of tenant space is declared as not being developed as part of this T.I. Incidental Storage & Laundry areas (greater than 100 sq. ft.) require 1-hour occupancy separation and minimum 3/4 hour door assemblies with penetration protection. All per approved plans on file. PC#03-092/drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/8/20039/10/20039/10/2003APASS
DetailsTony Young
Scheduled by a contractor via Hello! on 9/8/2003 at 12:12:02 PM. Contact: ###-####.
ok for perm. c of o 9/10/2003 12:09:59 PM
Permanent Occupancy 9/10/20039/10/2003 DONE
Details
BLD-Final7/30/20037/31/20037/31/2003PPART
DetailsTony Young
###-####
temp, c of o ok, some issues pending,,,, paperwork on changes, landing, trades, etc. 7/31/2003 4:34:11 PM
BLD-Grading Inspection7/30/20037/31/20037/31/2003ACANC
DetailsRita DeYoung
Scheduled by a contractor via Hello! on 7/30/2003 at 12:08:44 PM. Contact: ###-####.
FIRE-Final Inspection7/30/20037/31/20037/31/2003APASS
DetailsRick Jackson
###-####
FIRE-Conference7/21/20037/21/20037/21/2003PPART
DetailsRick Jackson
RON..HE WILL CALL YOU SET UP A TIME; Phone #: ###-#### Internet Inspection Request from: Dixie Fellows met with GC about final requirements; will need to verify AHU shutdown for shutdown on return side as mechanical plans didn't show size of units; extinguisher needed; door hardware and exiting through door to south 7/21/2003 4:36:04 PM
BLD-Conference6/12/20036/13/20036/13/2003APASS
DetailsTony Young
ron; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
drop of revised plan,, ok to cover firewalls,, recvd paper work from architect as requested 6/13/2003 11:21:57 AM
BLD-Framing/Rough-in6/11/20036/11/20036/11/2003PPART
DetailsTony Young
###-#### ron
ok to cover except for firewalls,,,, waiting for engineering and more demo 6/11/2003 2:50:46 PM
BLD-Framing/Rough-in6/6/20036/9/20036/9/2003AFAIL
DetailsTony Young
RON; Phone #: ###-#### Internet Inspection Request from: Darla Downs
c/n posted, no cover 6/9/2003 11:48:47 AM