BLD-Final | 7/14/2003 | 7/15/2003 | 7/15/2003 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 7/14/2003 at 7:46:06 PM. Contact: ###-####. Ok for a perm oc. 7/15/2003 11:06:33 AM
|
Permanent Occupancy | | 7/15/2003 | 7/15/2003 | | DONE |
|
|
|
|
BLD-Final | 5/22/2003 | 5/23/2003 | 5/23/2003 | A | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 5/22/2003 at 6:26:33 AM. Contact: ###-####. I canceled as it has showed up for a pm inspection. 5/23/2003 11:54:39 AM
|
BLD-Final | 5/23/2003 | 5/23/2003 | 5/23/2003 | P | PART |
Russ Owen
|
|
|
shawn; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. c/n for swithand ele over sink for reach range 5/23/2003 3:07:16 PM
|
FIRE-Alarm Testing | 5/23/2003 | 5/23/2003 | 5/23/2003 | A | PASS |
Troy Cobbley
|
|
|
fire life safety, fire alarm and fire sprinklers finaled 5/23/2003 11:10:11 AM
|
FIRE-Alarm Testing | 5/22/2003 | 5/22/2003 | 5/22/2003 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 5/22/2003 at 6:24:42 AM. Contact: ###-####. tested duct detectors for shut down - okay; need map at FACP 5/22/2003 4:00:46 PM
|
FIRE-Conference | 5/20/2003 | 5/20/2003 | 5/20/2003 | P | DONE |
Troy Cobbley
|
|
|
spoke with the contractor about fire extinguisher placement 5/20/2003 4:20:17 PM
|
BLD-Other | 5/16/2003 | 5/16/2003 | 5/16/2003 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 5/16/2003 at 6:58:28 AM. Contact: ###-####.
ceiling and beam ok 5/16/2003 11:43:16 AM
|
BLD-Other | 5/9/2003 | 5/9/2003 | 5/9/2003 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 5/9/2003 at 6:25:24 AM. Contact: ###-####.Ceiling all ok except the area of the beam at the notrh side. 5/9/2003 2:21:02 PM
|
BLD-Wall cover | 4/15/2003 | 4/16/2003 | 4/16/2003 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 4/15/2003 at 7:09:21 AM. Contact: ###-####.ok to drywall. 4/16/2003 11:02:02 AM
|