Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD03-00471
StatusFinaled
Name STEVE GALLOWAY
Site Address 923 N PALACE ROW
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for the remodel of 2 bathrooms in an existing single famil dwelling. Replacement of all fixtures cabinets and floof covering. If fans are replaced they must meet 2000 IRC R303.3 50cfm if switched or 20cfm continuous running. R-1B ok per ajb. Separate plumbing permit is required. All per the approved floor plan as marked. pep
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/9/20034/10/20034/10/2003APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 4/9/2003 at 1:28:18 PM. Contact: ###-####. C/C issued. 4/10/2003 10:24:14 AM
BLD-Final4/1/20034/1/20034/1/2003PNR
DetailsRuss Owen
LARRY; Phone #: ###-#### Internet Inspection Request from: Darla DownsCalled contractor this needs plumbing also gave a reminder for smoke detectors 4/1/2003 5:40:26 PM
BLD-Framing/Rough-in3/11/20033/12/20033/12/2003APASS
DetailsRuss Owen
Ok to drywall at tub ext wall. 3/12/2003 11:26:31 AM
BLD-Framing/Rough-in3/11/20033/11/20033/11/2003PPART
DetailsRuss Owen
###-#### LARRY. Needs insulation and vapor barrier put back in exterior wall contractor told to recall . 3/11/2003 2:59:32 PM