BLD-Final | 9/24/2004 | 9/27/2004 | 9/27/2004 | A | PASS |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 9/24/2004 at 2:05:50 PM.
|
BLD-Final | 9/23/2004 | 9/24/2004 | 9/24/2004 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/23/2004 at 3:15:54 PM. c/n on site 9/24/2004 12:42:56 PM
|
BLD-Grading Inspection | 9/23/2004 | 9/23/2004 | 9/23/2004 | | DONE |
|
|
|
Final grading and drainage approved
|
BLD-Final | 8/13/2004 | 8/17/2004 | 8/17/2004 | A | FAIL |
Dave Hannah
|
|
|
George; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes needs fire sprinkler and terry records sign off no inspection done 8/17/2004 9:57:56 AM
|
BLD-Conference | 1/13/2004 | 1/14/2004 | 1/14/2004 | A | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/13/2004 at 9:16:22 AM. Contact: ###-####.hand rail front steps 1/14/2004 8:51:39 AM
|
BLD-Energy code compliance | 9/29/2003 | 9/30/2003 | 9/30/2003 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 9/29/2003 at 2:25:09 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 9/29/2003 | 9/30/2003 | 9/30/2003 | A | PASS |
Steven Webb
|
|
|
Items completed on prior c/n..Received Ok from Valley Truss Co per one item on c/notice. 9/30/2003 11:06:02 AM
|
BLD-Energy code compliance | 9/26/2003 | 9/26/2003 | 9/26/2003 | P | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 9/26/2003 at 9:14:04 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 9/22/2003 | 9/23/2003 | 9/23/2003 | A | CANC |
Dave Hannah
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 9/23/2003 | 9/23/2003 | 9/23/2003 | P | FAIL |
Jim Storey
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Darla Downs truss co to field review and respond in writing for c/n ok to insulate walls. 9/23/2003 3:57:25 PM
|
BLD-Framing/Rough-in | 8/21/2003 | 8/22/2003 | 8/22/2003 | A | FAIL |
Dave Hannah
|
|
|
SCOTT SHEAR WALL; Phone #: ###-#### Internet Inspection Request from: Darla Downs need engineering on hold downs 8/22/2003 11:59:38 AM
|
BLD-Wall cover | 8/15/2003 | 8/15/2003 | 8/15/2003 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/15/2003 at 8:56:41 AM.
|
BLD-Wall cover | 8/11/2003 | 8/12/2003 | 8/12/2003 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/11/2003 at 12:39:02 PM. Contact: ###-####.
|
BLD-Foundation | 4/30/2003 | 4/30/2003 | 4/30/2003 | A | PART |
Dave Hannah
|
|
|
work in progress crew 90% complete rebar ok
|
BLD-Framing/Rough-in | 4/28/2003 | 4/30/2003 | 4/30/2003 | A | NR |
Dave Hannah
|
|
|
wolfton construction; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Footing | 4/16/2003 | 4/17/2003 | 4/17/2003 | A | PART |
Dave Hannah
|
|
|
rick; Phone #: ###-#### Internet Inspection Request from: Annette Moore work in progress forms up rebar at about 45% 4/17/2003 11:56:42 AM
|
BLD-Grading Inspection | 4/15/2003 | 4/15/2003 | 4/15/2003 | | DONE |
Rita DeYoung
|
|
|
Geotech has approved footing subgrade provided all loose or disturbed soil is removed from the footing trenches prior to placing concrete.
|