BLD-Final | 12/18/2003 | 12/19/2003 | 12/19/2003 | A | DONE |
Russ Owen
|
|
|
Camil; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Final | 12/18/2003 | 12/18/2003 | 12/18/2003 | P | PASS |
Tom Arcoraci
|
|
|
call 1st for access camil; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie lc issued 12/18/2003 3:56:31 PM
|
BLD-Final | 12/16/2003 | 12/17/2003 | 12/17/2003 | A | FAIL |
Russ Owen
|
|
|
Camil; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes c/n posted energy cert in garage. 12/17/2003 1:58:42 PM
|
BLD-Final | 12/16/2003 | 12/16/2003 | 12/16/2003 | P | CANC |
Russ Owen
|
|
|
camil--call 1st for access; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Needs mec prior. 12/16/2003 3:34:57 PM
|
BLD-Framing/Rough-in | 8/12/2003 | 8/13/2003 | 8/13/2003 | A | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 8/12/2003 | 8/12/2003 | 8/12/2003 | P | CANC |
Jim Sly
|
|
|
camial; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 8/12/2003 | 8/12/2003 | 8/12/2003 | P | PART |
Russ Owen
|
|
|
stair head height ok, called contractor about beam support in crawl and insulation at bonus room will recall. for am. 8/12/2003 3:37:27 PM
|
BLD-Energy code compliance | 8/6/2003 | 8/6/2003 | 8/6/2003 | P | FAIL |
Russ Owen
|
|
|
###-#### camil .Needs to complete 2 items of prior c/n head height at stairs and 2 beams shown as 3 c/n posted again andalos called buyilder left message to call me back, NOTE: I had meet and went over head height in full detail with builder. 8/6/2003 12:43:36 PM
|
BLD-Framing/Rough-in | 7/7/2003 | 7/8/2003 | 7/8/2003 | A | PART |
Russ Owen
|
|
|
shear. 7/7/2003 5:58:26 PM. ok to side c/n for int onsite. 7/8/2003 1:57:27 PM
|
BLD-Framing/Rough-in | 7/8/2003 | 7/8/2003 | 7/8/2003 | P | PART |
Russ Owen
|
|
|
CAMIL; Phone #: ###-#### Internet Inspection Request from: Darla Downs. Please call before inspection. 7/8/2003 11:34:28 AM. Ok to insulate, has some c/n items left. posted. 7/8/2003 5:56:07 PM
|
BLD-Framing/Rough-in | 7/7/2003 | 7/7/2003 | 7/7/2003 | P | FAIL |
Russ Owen
|
|
|
camil shear nail; Phone #: ###-#### Internet Inspection Request from: Darla Downsposted c/n. 7/7/2003 6:08:24 PM
|
BLD-Framing/Rough-in | 7/1/2003 | 7/2/2003 | 7/2/2003 | A | FAIL |
Russ Owen
|
|
|
camil ###-####. inspection left over from yesterday. 7/1/2003 5:26:17 PM. Items addressed at shear with builder have not been done no revised or approved plans on site. posted a c/n. 7/2/2003 1:44:46 PM
|
BLD-Framing/Rough-in | 7/1/2003 | 7/1/2003 | 7/1/2003 | P | CANC |
Russ Owen
|
|
|
CAMIL; Phone #: ###-#### Internet Inspection Request from: Annette Moore .out of time i have recalled this in for am. 7/1/2003 5:26:46 PM
|
BLD-Framing/Rough-in | 6/11/2003 | 6/12/2003 | 6/12/2003 | A | FAIL |
Russ Owen
|
|
|
left over from yesterday see notes from then. 6/11/2003 5:56:25 PM. rear wall and left wall changed, need revised floor and res check, unable to complete a shear inspection did go over general requirements with builder for shear.needs more staples. 6/12/2003 11:57:47 AM 6/12/2003 11:58:05 AM
|
BLD-Framing/Rough-in | 6/11/2003 | 6/11/2003 | 6/11/2003 | P | CANC |
Russ Owen
|
|
|
camil; Phone #: ###-#### Internet Inspection Request from: Annette Mooreunable to do was called into office by suppervisor. 6/11/2003 5:55:26 PM
|
BLD-Footing | 5/16/2003 | 5/19/2003 | 5/19/2003 | A | PASS |
Jim Sly
|
|
|
ben stem wall; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Footing | 5/15/2003 | 5/16/2003 | 5/16/2003 | P | PASS |
Dave Hannah
|
|
|
BEN- OR MET - ###-####
|