BLD-Final | 9/16/2003 | 9/17/2003 | 9/17/2003 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/16/2003 at 2:58:22 PM. Contact: ###-####. Final Pass :) 9/17/2003 10:18:51 AM
|
FIRE-Final Inspection | 9/15/2003 | 9/16/2003 | 9/16/2003 | P | PASS |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 9/15/2003 at 12:39:37 PM. Contact: ###-####.
|
FIRE-Final Inspection | 8/29/2003 | 9/2/2003 | 9/2/2003 | P | FAIL |
Troy Cobbley
|
|
|
Provide emergency shutoff signage in locations per conversation and provide a fire extinguisher in the shelter 9/2/2003 1:43:43 PM
|
FIRE-Final Inspection | 8/14/2003 | 8/18/2003 | 8/18/2003 | P | FAIL |
Troy Cobbley
|
|
|
Provide verification of IFC sections 3203.2.6, 3203.4.4, 3203.4.6. Provide NFPA 704 markings for the tank. Provide verification of fail safe controls per review note 4, IFC 3005.2 8/18/2003 3:05:13 PM
|
BLD-Conference | 8/14/2003 | 8/15/2003 | 8/15/2003 | A | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/14/2003 at 1:21:20 PM.
|