BLD-Final | 5/5/2004 | 5/6/2004 | 5/6/2004 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/5/2004 at 1:30:26 PM. Contact: ###-####. needs elec and mec finals 5/6/2004 10:26:25 AM
|
BLD-Energy code compliance | 10/14/2003 | 10/14/2003 | 10/14/2003 | P | PASS |
Dave Hannah
|
|
|
myron ###-#### this is a mc call # ok to cover 10/14/2003 4:39:15 PM
|
BLD-Framing/Rough-in | 8/28/2003 | 8/29/2003 | 8/29/2003 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/28/2003 at 9:52:24 AM. Contact: ###-####. 8/29/2003 8:50:51 AM ok to insulate 8/29/2003 11:12:42 AM
|
BLD-Conference | 8/11/2003 | 8/12/2003 | 8/12/2003 | A | PASS |
Carl Dependahl
|
|
|
###-####//###-####//###-####susan...need ER for product...looks ok, also referred to plan check 8/12/2003 10:48:31 AM
|
BLD-Framing/Rough-in | 8/12/2003 | 8/12/2003 | 8/12/2003 | A | PART |
Carl Dependahl
|
|
|
shear ok, need foam info
|
BLD-Conference | 8/11/2003 | 8/11/2003 | 8/11/2003 | P | PASS |
Carl Dependahl
|
|
|
need foam specs...keep c/n
|
BLD-Framing/Rough-in | 7/7/2003 | 7/7/2003 | 7/7/2003 | P | FAIL |
Carl Dependahl
|
|
|
myron shear nail; Phone #: ###-#### Internet Inspection Request from: Darla Downs, fix holdowns/sheathing...block / nail as needed. reinsp req'd 7/7/2003 5:05:49 PM
|
BLD-Foundation | 5/8/2003 | 5/9/2003 | 5/9/2003 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 5/8/2003 at 11:53:03 AM. Contact: ###-####.
wip, need to dowell into existing 5/9/2003 10:29:29 AM
|
BLD-Footing | 5/7/2003 | 5/7/2003 | 5/7/2003 | P | PART |
Carl Dependahl
|
|
|
CHUCK; Phone #: ###-#### Internet Inspection Request from: Darla Downs...ftgs ok, adding last bar at ftg 5/7/2003 4:52:38 PM
|