BLD-Final | 8/19/2003 | 8/21/2003 | 8/21/2003 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 8/19/2003 at 1:37:45 PM. Contact: ###-####. OK FOR PERM OCC 8/21/2003 3:21:37 PM
|
Permanent Occupancy | | 8/21/2003 | 8/21/2003 | | DONE |
|
|
|
|
BLD-Final | 6/26/2003 | 6/27/2003 | 6/27/2003 | P | PART |
Tom Arcoraci
|
|
|
###-#### needs fire insp 6/27/2003 1:16:17 PM OK FOR TEMP NEEDS PANIV HD ON ONE DOOR AND TO REMAIN OPEN SIGN ON OTHER OK FOR TEMP OCC 6/27/2003 3:11:41 PM
|
FIRE-Final Inspection | 6/9/2003 | 6/9/2003 | 6/9/2003 | P | FAIL |
Troy Cobbley
|
|
|
wayne ; Phone #: ###-#### Heads in showroom area are overspaced. Provide approved fire sprinkler plans as per note #7. There was no access to verify if the fire alarm system was code compliant per note #9, the contractor to verify. Exit sign in office does not appear to have the required battery backup. Provide approved door hardware per review note # 15 and the approved drawings. Verify yearly inspection has been performed on the fire sprinkler riser per review note #21. 6/9/2003 4:13:45 PM
|
BLD-Framing/Rough-in | 6/6/2003 | 6/6/2003 | 6/6/2003 | P | PASS |
Tom Arcoraci
|
|
|
wayne; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|