BLD-Final | 9/29/2003 | 9/30/2003 | 9/30/2003 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/29/2003 at 2:28:57 PM. Contact: ###-####. C/C issued. 9/30/2003 11:16:08 AM
|
BLD-Final | 9/26/2003 | 9/29/2003 | 9/29/2003 | A | FAIL |
Russ Owen
|
|
|
###-#### bob c/n for safety glass at garage man door , located in master bed room... 9/28/2003 5:02:42 PM
|
BLD-Energy code compliance | 6/29/2003 | 6/30/2003 | 6/30/2003 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Bob Parsons
|
BLD-Framing/Rough-in | 6/25/2003 | 6/26/2003 | 6/26/2003 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/25/2003 at 7:26:02 PM. Contact: ###-####. C/N posted. 6/26/2003 12:48:57 PM
|
BLD-Framing/Rough-in | 6/10/2003 | 6/11/2003 | 6/11/2003 | A | PART |
Jim Sly
|
|
|
ridgewood homes shear; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Complete 1 item on corr.....2 full length studs at Gar front HDs. OK to side the rest....... 6/11/2003 12:00:52 PM 6/11/2003 12:01:27 PM
|
BLD-Framing/Rough-in | 6/8/2003 | 6/9/2003 | 6/9/2003 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/8/2003 at 11:27:16 PM. Contact: ###-####. C/N for shear. 6/9/2003 1:33:33 PM
|
BLD-Framing/Rough-in | 6/5/2003 | 6/5/2003 | 6/5/2003 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/5/2003 at 7:15:59 AM. Contact: ###-####. C/N Need appr plans. 6/5/2003 11:42:32 AM
|
BLD-Foundation | 5/19/2003 | 5/20/2003 | 5/20/2003 | A | PART |
Steven Webb
|
|
|
bob ; Phone #: ###-#### Internet Inspection Request from: Barbara Moore wip--85% ready at time of inspection. 5/20/2003 10:35:42 AM
|
BLD-Footing | 5/16/2003 | 5/19/2003 | 5/19/2003 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/16/2003 at 9:16:05 AM. Contact: ###-####.
|