BLD-Final | 4/23/2004 | 4/26/2004 | 4/26/2004 | P | PASS |
Jim Sly
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 4/26/2004 12:45:52 PM C/C issued. 4/26/2004 1:41:56 PM
|
FIRE-Final Inspection | 4/23/2004 | 4/26/2004 | 4/26/2004 | A | PASS |
Troy Cobbley
|
|
|
fire life safety finaled 4/26/2004 9:01:36 AM
|
BLD-Final | 4/20/2004 | 4/21/2004 | 4/21/2004 | A | NR |
Russ Owen
|
|
|
jim ; Phone #: ###-#### Internet Inspection Request from: Annette Moore needs fire life safey inspection first. called and informed.4/20/2004 8:09:34 PM 4/20/2004 8:09:54 PM
|
BLD-Framing/Rough-in | 10/7/2003 | 10/7/2003 | 10/7/2003 | P | PASS |
Russ Owen
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Darla Downs special inspection only required for the welding and bolting per engineer also off-set colums ok. 10/7/2003 12:25:30 AM
|
BLD-Footing | 9/24/2003 | 9/25/2003 | 9/25/2003 | A | FAIL |
Jim Sly
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Darla Downs C/N Arch or Eng to prepare special insp program.....No concrete PSI indicated on appr plan, Eng to approve anchor bolts not located in center of concrete pier. 9/25/2003 11:28:55 AM
|
BLD-Concrete | 9/22/2003 | 9/24/2003 | 9/24/2003 | P | CANC |
Jim Sly
|
|
|
richard; Phone #: ###-#### Internet Inspection Request from: Darla Downs jim called to canc this inspefction as they were not ready///dld 9-24-03
|
BLD-Aging Inspection | 9/8/2003 | 9/8/2003 | 9/8/2003 | | PART |
Jim Sly
|
|
|
Church ###-#### Bldr (Dick) ###-#### Called ....Will start project soon. OK
9/12/2003 11:23:39 AM 9/12/2003 11:53:08 AM
|