BLD-Conference | 10/28/2004 | 10/28/2004 | 10/28/2004 | A | CANC |
Gary Ziegler
|
|
|
|
BLD-Final | 12/22/2003 | 12/23/2003 | 12/23/2003 | A | PASS |
Dave Hannah
|
|
|
Please call Jason at ###-#### to meet with inspector at site. Terry Records has signed off on grading-a bond was posted with Kathy. ; Phone #: ###-#### Internet Inspection Request from: Gary Gettman
|
BLD-Grading Inspection | 12/22/2003 | 12/22/2003 | 12/22/2003 | | BND |
Rita DeYoung
|
|
|
Rough grading is complete. Fine grading and revegetation are incomplete. Also, drainage system was modified without approval. Engineer has recommended a $700.00 bond to ensure that drainage will be revised to comply with the approved plan. The grading and drainage is conditionally approved upon receipt of a $700.00 bond.
|
BLD-Final | 12/19/2003 | 12/19/2003 | 12/19/2003 | P | FAIL |
Dave Hannah
|
|
|
Please do as early as possible in the pm. Please call gary at ###-#### to meet inspector at project. Thanks; Phone #: ###-#### Internet Inspection Request from: Gary Gettman needs to finish deck and get terrys records sign off 12/19/2003 2:32:33 PM
|
BLD-Final | 12/18/2003 | 12/18/2003 | 12/18/2003 | P | FAIL |
Dave Hannah
|
|
|
Gary; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes c/n items not complete c/n not on site 12/18/2003 2:33:27 PM
|
BLD-Final | 12/16/2003 | 12/16/2003 | 12/16/2003 | P | FAIL |
Steven Webb
|
|
|
Mech insp. also scheduled for this afternoon. Please come as late as possible. Call me to meet you at the site-Thanks. Gary; Phone #: ###-#### Internet Inspection Request from: Gary Gettman Correction notice issued--C/N located on kitchen counter in upper unit. 12/16/2003 3:30:33 PM
|
BLD-Energy code compliance | 10/30/2003 | 10/30/2003 | 10/30/2003 | P | PASS |
Dave Hannah
|
|
|
gary--for duplex both units; Phone #: ###-#### Internet Inspection Request from: Marsha Smylieok to cover 10/30/2003 3:10:38 PM
|
BLD-Final | 10/28/2003 | 10/28/2003 | 10/28/2003 | P | NR |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 10/27/2003 | 10/28/2003 | 10/28/2003 | P | PASS |
Dave Hannah
|
|
|
Alicia; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes ok to insulate 10/28/2003 5:53:37 AM
|
BLD-Framing/Rough-in | 10/24/2003 | 10/24/2003 | 10/24/2003 | P | CANC |
Dave Hannah
|
|
|
Jason; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Foundation | 8/1/2003 | 8/1/2003 | 8/1/2003 | P | PART |
Dave Hannah
|
|
|
donny; Phone #: ###-#### Internet Inspection Request from: Barbara Moore work in progress 80% completed 8/1/2003 2:41:03 PM
|
BLD-Footing | 7/24/2003 | 7/25/2003 | 7/25/2003 | A | PASS |
Dave Hannah
|
|
|
donny; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Grading Inspection | 7/18/2003 | 7/18/2003 | 7/18/2003 | | PASS |
Rita DeYoung
|
|
|
Geotech approved footing subgrade
|