Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD03-00915
StatusFinaled
Name PRESTIGE HOMES INC
Site Address 4260 E ARBORVITAE CT
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a four bedroom, two bathroom 2089 sq. ft. two story single family dwelling (1753 sq. ft. first floor/336 sq. ft. second floor) with a attached 752 sq. ft. three car garage. Per approved plans and requirement list. PC#240 (SAM)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/8/20039/8/20039/8/2003PPASS
DetailsJim Storey
BLD-Final9/3/20039/4/20039/4/2003AFAIL
DetailsJim Storey
TROY; Phone #: ###-#### Internet Inspection Request from: Marc Lileks handrail in garage/fire stop ceilling/crawlspace vent sys.to be tested with engineer witness, 9/4/2003 9:41:17 AM
BLD-Energy code compliance7/7/20037/7/20037/7/2003PPASS
DetailsJim Storey
terry; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Framing/Rough-in7/3/20037/3/20037/3/2003PPASS
DetailsSteven Webb
terry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore FRAMING CORRECTION NOTICE OK..OK TO INSULATE. 7/3/2003 3:39:30 PM
BLD-Framing/Rough-in7/1/20037/2/20037/2/2003AFAIL
DetailsDave Hannah
###-#### still no elec 7/2/2003 9:31:39 AM
BLD-Framing/Rough-in6/30/20037/1/20037/1/2003PPART
DetailsSteven Webb
Scheduled by a contractor via Hello! on 6/30/2003 at 2:42:19 PM. Contact: ###-####. C/N -- Ok to insulate pending electrical rough-in. 7/1/2003 3:36:17 PM
BLD-Framing/Rough-in6/17/20036/18/20036/18/2003APART
DetailsJim Storey
gerry shear nail; Phone #: ###-#### Internet Inspection Request from: Barbara Moore exterior ok 6/18/2003 10:34:08 AM
BLD-Foundation5/27/20035/28/20035/28/2003APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/27/2003 at 12:58:13 PM. Contact: ###-####.
BLD-Footing5/27/20035/27/20035/27/2003PPASS
DetailsJim Storey
###-####
BLD-Foundation5/22/20035/23/20035/23/2003AFAIL
DetailsAlan Hauser
2nd trip for inspection, still no work started, only hole in ground, not even trailer on site. reinspection fee, no inspections till paid 5/23/2003 8:30:30 PM
BLD-Footing5/22/20035/22/20035/22/2003ANR
DetailsSteven Webb
Scheduled by a contractor via Hello! on 5/22/2003 at 7:25:15 AM. Contact: ###-####.