BLD-Conference | 8/13/2004 | 8/13/2004 | 8/13/2004 | | CANC |
Dave Hannah
|
|
|
contractor terminated as of this date work to be completed by owner lee ann garton per george slane and new permit for said work to be completed through fn insp
|
BLD-Final | 8/12/2004 | 8/13/2004 | 8/13/2004 | A | CANC |
Troy James
|
|
|
leeann ###-#### or ###-####
|
BLD-Energy code compliance | 1/7/2004 | 1/8/2004 | 1/8/2004 | A | PASS |
Dave Hannah
|
|
|
leeann ; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok to cover basement walls 1/8/2004 9:57:26 AM
|
BLD-Energy code compliance | 1/7/2004 | 1/7/2004 | 1/7/2004 | P | NH |
Tony Young
|
|
|
leanne; Phone #: ###-#### Internet Inspection Request from: Annette Moore
door was not open 1/7/2004 3:59:48 PM
|
BLD-Foundation | 12/17/2003 | 12/18/2003 | 12/18/2003 | A | CANC |
Dave Hannah
|
|
|
LeAnn ; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Framing/Rough-in | 12/18/2003 | 12/18/2003 | 12/18/2003 | A | CANC |
Dave Hannah
|
|
|
beam across kitchin bolted and post to beam connections ok ok to cover
|
BLD-Conference | 9/12/2003 | 9/15/2003 | 9/15/2003 | A | DONE |
Dave Hannah
|
|
|
###-#### leeAnn ( Has some issues with her contractor. Needs to know what is done and correct ) c/n on site this was not a complete inspection need plans on site 9/15/2003 11:48:22 AM
|
BLD-Framing/Rough-in | 5/15/2003 | 5/16/2003 | 5/16/2003 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 5/15/2003 at 5:44:48 PM. c/n, ok to roof & side, add posts, bolt up beam as req'd, membrane roofing needed as <2:12...complete other trades; owner has sep. bsmt permit. 5/16/2003 10:02:05 AM
|