BLD-Final | 2/9/2004 | 2/10/2004 | 2/10/2004 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/9/2004 at 1:11:25 PM. Contact: ###-####.
|
BLD-Conference | 10/7/2003 | 10/6/2003 | 10/6/2003 | A | PART |
Russ Owen
|
|
|
Spoke with Bob Archibald and talked with Rob from gale we will allow vapor retarder alternate if information is supplied for paint that will meet 1 perm rating. 10/7/2003 7:12:18 PM
|
BLD-Energy code compliance | 10/2/2003 | 10/2/2003 | 10/2/2003 | P | FAIL |
Russ Owen
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Annette Moore insulated ok, but no vapor barrier in place, i called Gale insulation and told them to provide verification of vapor barrier not required, also call an 800 number listed on insulation but no one available to talk with, also called Ingo strupe with the State of Idaho Energy division and left message to call me , to see if he could know this. I posted a c/n to verify that it would not be required. contractors worker on site also notified. edaai9ikle 10/1/2003 10:06:55 PM
|
BLD-Framing/Rough-in | 9/29/2003 | 9/30/2003 | 9/30/2003 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 9/29/2003 at 4:53:00 PM. Contact: ###-####. Items completed on prior c/n--ok to insulate. 9/30/2003 11:06:34 AM
|
BLD-Framing/Rough-in | 9/27/2003 | 9/29/2003 | 9/29/2003 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 9/27/2003 at 9:52:06 AM. Contact: ###-####. Need to complete items c/n dated 9/29/03. posted by insulation sticker 2nd floor. 9/29/2003 12:31:23 AM
|
BLD-Framing/Rough-in | 9/27/2003 | 9/29/2003 | 9/29/2003 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 9/27/2003 at 9:52:06 AM. Contact: ###-####. Need to complete items c/n dated 9/29/03. posted by insulation sticker 2nd floor. 9/29/2003 12:31:23 AM
|
BLD-Framing/Rough-in | 9/25/2003 | 9/26/2003 | 9/26/2003 | P | FAIL |
Russ Owen
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Annette Moore c/n on site. 9/25/2003 11:08:40 PM
|
BLD-Conference | 7/29/2003 | 7/29/2003 | 7/29/2003 | P | CANC |
Dave Hannah
|
|
|
ftg, early pm please...
|
BLD-Footing | 7/29/2003 | 7/29/2003 | 7/29/2003 | P | PART |
Dave Hannah
|
|
|
work in progress crew still tieing rebar
|
BLD-Footing | 7/28/2003 | 7/29/2003 | 7/29/2003 | A | NR |
Carl Dependahl
|
|
|
###-####
|
BLD-Footing | 7/24/2003 | 7/28/2003 | 7/28/2003 | A | CANC |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 7/24/2003 at 4:26:11 PM. Contact: ###-####.
|