BLD-Final | 8/11/2003 | 8/12/2003 | 8/12/2003 | A | PASS |
Jim Sly
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Barbara Moore C/C issued. 8/12/2003 11:03:28 AM
|
BLD-Final | 8/8/2003 | 8/8/2003 | 8/8/2003 | A | FAIL |
Tom Arcoraci
|
|
|
###-####; I cloned this inspection for a strcutural final as the caller requested a fire final - fire not required for sign-off - Rick J. needs plumb final 8/8/2003 10:07:43 AM
|
FIRE-Final Inspection | 8/7/2003 | 8/8/2003 | 8/8/2003 | A | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 8/7/2003 at 8:18:10 AM. Contact: ###-####. fire not required for sign-off 8/8/2003 10:59:37 AM
|
BLD-Framing/Rough-in | 6/12/2003 | 6/13/2003 | 6/13/2003 | A | PASS |
Jim Storey
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Foundation | 5/15/2003 | 5/16/2003 | 5/16/2003 | A | PART |
Jim Storey
|
|
|
pwoi ab spacing need to check approved plan. 5/16/2003 2:15:44 PM
|
BLD-Foundation | 5/15/2003 | 5/15/2003 | 5/15/2003 | P | CANC |
Jim Storey
|
|
|
###-#### ###-#### out of time. 5/15/2003 5:58:04 PM
|
BLD-Footing | 5/13/2003 | 5/13/2003 | 5/13/2003 | P | PASS |
Dave Hannah
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|