Permit Information
Permit NumberBLD03-01071
StatusFinaled
Name SPECIALTY HOMES
Site Address 11130 W INGLIN
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a three bedroom, two and half bathroom 3289 sq. ft. two story single family dwelling (2374 sq. ft. first floor/915 sq. ft. second floor) with a UNFINISHED 242 sq. ft. basement, a attached 600 sq. ft. two car garage and a DETACHED 242 sq. ft. single car garage. Per approved plans, engineering and requirement list. This is a solar protected lot. PC#269 (SAM)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/4/200311/6/200311/6/2003APASS
DetailsTom Arcoraci
re-inspection. 11/4/2003 11:43:07 PM lc issued 11/6/2003 9:10:58 AM
BLD-Final11/4/200311/5/200311/5/2003ACANC
DetailsTom Arcoraci
Val ###-####///please call for access///was doc finaled before final.
BLD-Final11/5/200311/5/200311/5/2003PFAIL
DetailsRuss Owen
c/n given to contractor. 11/6/2003 1:18:41 PM
BLD-Energy code compliance8/6/20038/7/20038/7/2003APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 8/6/2003 at 4:23:00 PM. Contact: ###-####.
BLD-Framing/Rough-in8/7/20038/7/20038/7/2003PPASS
DetailsRuss Owen
also energy code. 8/7/2003 5:20:18 PM
BLD-Framing/Rough-in8/6/20038/7/20038/7/2003APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 8/6/2003 at 4:22:18 PM. Contact: ###-####.
BLD-Energy code compliance8/5/20038/6/20038/6/2003APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 8/5/2003 at 11:44:37 AM. Contact: ###-####.2 units have c/n. 8/6/2003 5:55:02 PM
BLD-Framing/Rough-in8/5/20038/6/20038/6/2003APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 8/5/2003 at 11:43:06 AM. Contact: ###-####. 2 units have c/n. 8/6/2003 5:54:54 PM
BLD-Framing/Rough-in8/2/20038/4/20038/4/2003AFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 8/2/2003 at 11:55:31 AM. Contact: ###-####.posyed a c/n. 8/4/2003 3:23:16 PM
BLD-Conference7/31/20038/1/20038/1/2003AFAIL
DetailsRuss Owen
call ###-#### 1/2 prior. 7/31/2003 6:45:58 PM Went to site met with builder he said he called the office to ask if a shear inspection would be required, some one told him a framing inspection and insulation inspection would be required only, The house is papered and wired ready for stucco, we pelled back some areas at hold downs and they had been nailed, then at the lower front there were some walls which the enginner wanted a little tighter pattern for staple , it appead by the removal of some paper and wire that this was alittle short so they will add some more at these front panels. NOTE:The entire house has been done in osb , so there is more shear than would be required by minimum code. code. 8/1/2003 4:07:14 PM
BLD-Framing/Rough-in7/30/20037/31/20037/31/2003PCANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 7/30/2003 at 4:51:53 PM. Contact: ###-####.Out of time. 7/31/2003 6:56:08 PM
BLD-Framing/Rough-in7/29/20037/30/20037/30/2003ANR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 7/29/2003 at 9:07:29 AM. Contact: ###-####.. c/n posted needs mec and side d with out approval. 7/30/2003 12:36:42 PM
BLD-Foundation6/16/20036/17/20036/17/2003APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 6/16/2003 at 12:41:18 PM. wip ok 6/17/2003 9:50:47 AM
BLD-Footing6/12/20036/13/20036/13/2003APART
DetailsRuss Owen
mark; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Work in progress,clean out some areas and support bar. 6/13/2003 10:23:15 AM