BLD-Final | 11/4/2003 | 11/6/2003 | 11/6/2003 | A | PASS |
Tom Arcoraci
|
|
|
re-inspection. 11/4/2003 11:43:07 PM lc issued 11/6/2003 9:10:58 AM
|
BLD-Final | 11/4/2003 | 11/5/2003 | 11/5/2003 | A | CANC |
Tom Arcoraci
|
|
|
Val ###-####///please call for access///was doc finaled before final.
|
BLD-Final | 11/5/2003 | 11/5/2003 | 11/5/2003 | P | FAIL |
Russ Owen
|
|
|
c/n given to contractor. 11/6/2003 1:18:41 PM
|
BLD-Energy code compliance | 8/6/2003 | 8/7/2003 | 8/7/2003 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 8/6/2003 at 4:23:00 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 8/7/2003 | 8/7/2003 | 8/7/2003 | P | PASS |
Russ Owen
|
|
|
also energy code. 8/7/2003 5:20:18 PM
|
BLD-Framing/Rough-in | 8/6/2003 | 8/7/2003 | 8/7/2003 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 8/6/2003 at 4:22:18 PM. Contact: ###-####.
|
BLD-Energy code compliance | 8/5/2003 | 8/6/2003 | 8/6/2003 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 8/5/2003 at 11:44:37 AM. Contact: ###-####.2 units have c/n. 8/6/2003 5:55:02 PM
|
BLD-Framing/Rough-in | 8/5/2003 | 8/6/2003 | 8/6/2003 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 8/5/2003 at 11:43:06 AM. Contact: ###-####. 2 units have c/n. 8/6/2003 5:54:54 PM
|
BLD-Framing/Rough-in | 8/2/2003 | 8/4/2003 | 8/4/2003 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 8/2/2003 at 11:55:31 AM. Contact: ###-####.posyed a c/n. 8/4/2003 3:23:16 PM
|
BLD-Conference | 7/31/2003 | 8/1/2003 | 8/1/2003 | A | FAIL |
Russ Owen
|
|
|
call ###-#### 1/2 prior. 7/31/2003 6:45:58 PM Went to site met with builder he said he called the office to ask if a shear inspection would be required, some one told him a framing inspection and insulation inspection would be required only, The house is papered and wired ready for stucco, we pelled back some areas at hold downs and they had been nailed, then at the lower front there were some walls which the enginner wanted a little tighter pattern for staple , it appead by the removal of some paper and wire that this was alittle short so they will add some more at these front panels. NOTE:The entire house has been done in osb , so there is more shear than would be required by minimum code. code. 8/1/2003 4:07:14 PM
|
BLD-Framing/Rough-in | 7/30/2003 | 7/31/2003 | 7/31/2003 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 7/30/2003 at 4:51:53 PM. Contact: ###-####.Out of time. 7/31/2003 6:56:08 PM
|
BLD-Framing/Rough-in | 7/29/2003 | 7/30/2003 | 7/30/2003 | A | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 7/29/2003 at 9:07:29 AM. Contact: ###-####.. c/n posted needs mec and side d with out approval. 7/30/2003 12:36:42 PM
|
BLD-Foundation | 6/16/2003 | 6/17/2003 | 6/17/2003 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/16/2003 at 12:41:18 PM. wip ok 6/17/2003 9:50:47 AM
|
BLD-Footing | 6/12/2003 | 6/13/2003 | 6/13/2003 | A | PART |
Russ Owen
|
|
|
mark; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Work in progress,clean out some areas and support bar. 6/13/2003 10:23:15 AM
|