BLD-Final | 7/30/2003 | 7/30/2003 | 7/30/2003 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 7/30/2003 at 8:23:02 AM. Contact: ###-####.
per the plan 7/30/2003 2:51:29 PM
|
BLD-Final | 7/28/2003 | 7/29/2003 | 7/29/2003 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/28/2003 at 3:27:00 PM. Contact: ###-####. needs elec final and mec final 7/29/2003 1:51:41 PM
|
BLD-Energy code compliance | 6/12/2003 | 6/13/2003 | 6/13/2003 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/12/2003 at 3:26:07 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 6/11/2003 | 6/12/2003 | 6/12/2003 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/11/2003 at 3:42:13 PM. ok to insulate 6/12/2003 9:47:09 AM
|
BLD-Conference | 6/4/2003 | 6/4/2003 | 6/4/2003 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/4/2003 at 8:03:51 AM. Contact: ###-####.
|