Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD03-01093
StatusFinaled
Name TSYS TECHNOLOGY CENTER
Site Address 701 E MORRISON KNUDSEN DR Unit: 400
Project NameMK PLAZA II-4TH FLR
Customer Number 
ePlanReviewNo
Description
(8-14-03) (TSYS TECHNOLOGY CENTER - MK PLAZA II - 4TH FLOOR) THE PROJECT SCOPE CHANGED. THE ENTIRE 4TH FLOOR (28,000 SQUARE FEET) WILL BE OCCUPIED BY "TSYS TECHNOLOGH CENTER". THIS PERMIT IS NOW INTENDED TO ESTABLISH A PERMANENT CERTIFICATE OF OCCUPANCY FOR "TSYS". THE EXISTING HORIZONTAL EXIT SHALL BE MAINTAINED. (5-14-03) (SEARS ROEBUCK AND CO - MK PLAZA II - 4TH FLOOR) This building is NOT fire sprinklered. To remodel the West half (13,994 square feet) of the 4th floor of MK Plaza II for a new office occupant. This permit is intended to establish a TEMPORARY Certificate of Occupancy valid for up to 90 days. The building official may grant extensions for demonstrated cause. The existing exiting system shall be maintained operational. All egress doors shall be openable from the egress side without the use of a key or any special knowledge or effort. Security for the tenants, if needed, will be provided by security guards. A future permit will modify the egress system to resolve security issues. Work is to include a 220 square foot "LAN" (Local Area Network) room (full height walls and a door) per approved drawings and plan review conditions on file. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference8/18/20038/19/20038/19/2003ADONE
DetailsDave Hannah
BLD-Final8/19/20038/19/20038/19/2003APASS
DetailsDave Hannah
ok for occ scope of work changed permit revised
Permanent Occupancy 8/19/20038/19/2003 DONE
Details
BLD-Conference8/18/20038/18/20038/18/2003PCANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/18/2003 at 10:41:36 AM. Contact: ###-####.
BLD-Aging Inspection8/5/20038/5/20038/5/2003 PASS
DetailsDave Hannah
work in progress 8/11/2003 9:34:16 AM
BLD-Final6/2/20036/3/20036/3/2003APART
DetailsDave Hannah
Don, ###-#### ok to use LAN room still needs bracing on top of walls this can be done during remolde 6/3/2003 1:01:50 PM
FIRE-Conference6/2/20036/2/20036/2/2003PPART
DetailsRick Jackson
Don, ###-#### per scope of work a temp is approved per Tim H. 6/2/2003 2:10:03 PM
BLD-Framing/Rough-in5/19/20035/20/20035/20/2003APART
DetailsDave Hannah
Don, ###-#### ok to cover walls for l a n room 5/20/2003 10:52:04 AM