BLD-Conference | 8/18/2003 | 8/19/2003 | 8/19/2003 | A | DONE |
Dave Hannah
|
|
|
|
BLD-Final | 8/19/2003 | 8/19/2003 | 8/19/2003 | A | PASS |
Dave Hannah
|
|
|
ok for occ scope of work changed permit revised
|
Permanent Occupancy | | 8/19/2003 | 8/19/2003 | | DONE |
|
|
|
|
BLD-Conference | 8/18/2003 | 8/18/2003 | 8/18/2003 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/18/2003 at 10:41:36 AM. Contact: ###-####.
|
BLD-Aging Inspection | 8/5/2003 | 8/5/2003 | 8/5/2003 | | PASS |
Dave Hannah
|
|
|
work in progress 8/11/2003 9:34:16 AM
|
BLD-Final | 6/2/2003 | 6/3/2003 | 6/3/2003 | A | PART |
Dave Hannah
|
|
|
Don, ###-#### ok to use LAN room still needs bracing on top of walls this can be done during remolde 6/3/2003 1:01:50 PM
|
FIRE-Conference | 6/2/2003 | 6/2/2003 | 6/2/2003 | P | PART |
Rick Jackson
|
|
|
Don, ###-#### per scope of work a temp is approved per Tim H. 6/2/2003 2:10:03 PM
|
BLD-Framing/Rough-in | 5/19/2003 | 5/20/2003 | 5/20/2003 | A | PART |
Dave Hannah
|
|
|
Don, ###-#### ok to cover walls for l a n room 5/20/2003 10:52:04 AM
|