Permit Information
Permit NumberBLD03-01133
StatusFinaled
Name ADA COUNTY
Site Address 7200 W BARRISTER DR
Project NameAda County Jail-Pod C Fndtn
Customer Number 
ePlanReviewNo
Description
Ada County Jail Pod C Foundation Permit Only - To construct the foundation work for the Ada County Jail Pod C Housing Unit Addition. No work beyond the foundation is approved under this permit. The building permit for the remainder of the building construction is BLD03-00686. All construction per the approved plans. PC#284-03/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection3/29/20043/29/20043/29/2004 PASS
DetailsTom Arcoraci
BLD-Aging Inspection1/27/20041/27/20041/27/2004 NR
DetailsTom Arcoraci
BLD-Aging Inspection11/27/200311/27/200311/27/2003 NR
DetailsTom Arcoraci
BLD-Aging Inspection9/25/20039/25/20039/25/2003 PASS
DetailsTom Arcoraci
wip 9/25/2003 8:31:07 AM
BLD-Footing6/24/20036/25/20036/25/2003APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 6/24/2003 at 3:01:49 PM. Contact: ###-####. wip with mti 6/25/2003 9:25:54 AM
BLD-Footing6/10/20036/11/20036/11/2003APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 6/10/2003 at 9:50:27 PM. Contact: ###-####. Received ok from engineer for ele conduit in walls. 6/11/2003 11:03:38 AM
BLD-Footing6/6/20036/9/20036/9/2003AFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 6/6/2003 at 12:54:35 PM. Contact: ###-####.Posted a c/n for emt conduit in footing and walls contractor on site will obtain approval from design engineer. 6/9/2003 11:33:11 AM
BLD-Footing6/2/20036/3/20036/3/2003APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 6/2/2003 at 2:39:42 PM. Contact: ###-####. pending mti 6/3/2003 8:49:30 AM 6/3/2003 8:50:26 AM
BLD-Footing5/30/20036/2/20036/2/2003APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 5/30/2003 at 11:35:38 AM. Contact: ###-####. Footing at Grid lines A and 2 OK pending MTI inspection and approval. 6/2/2003 12:09:24 PM