BLD-Final | 9/19/2003 | 9/19/2003 | 9/19/2003 | P | PASS |
Jim Storey
|
|
|
greg; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Final | 9/17/2003 | 9/18/2003 | 9/18/2003 | A | FAIL |
Jim Storey
|
|
|
left over 9/17/2003 1:09:41 AM need plm and ele. 9/18/2003 11:18:18 AM
|
BLD-Final | 9/16/2003 | 9/17/2003 | 9/17/2003 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 9/16/2003 at 9:22:40 PM. Contact: ###-####. Out of time (short of staff) cloned for next shift. 9/17/2003 1:03:49 AM
|
BLD-Final | 8/15/2003 | 8/15/2003 | 8/15/2003 | P | CANC |
Russ Owen
|
|
|
wrong permit no. 8/15/2003 10:41:54 AM
|
BLD-Conference | 8/13/2003 | 8/13/2003 | 8/13/2003 | P | CANC |
Russ Owen
|
|
|
|
BLD-Energy code compliance | 8/7/2003 | 8/7/2003 | 8/7/2003 | P | PART |
Carl Dependahl
|
|
|
walls ok
|
BLD-Framing/Rough-in | 8/7/2003 | 8/7/2003 | 8/7/2003 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 8/7/2003 at 7:57:06 AM. Contact: ###-####.
|
BLD-Final | 8/5/2003 | 8/6/2003 | 8/6/2003 | A | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 8/5/2003 at 7:02:27 PM. Contact: ###-####....complete frame item (joist over stairs)...ok to insulate 8/6/2003 10:05:26 AM
|
BLD-Framing/Rough-in | 8/6/2003 | 8/6/2003 | 8/6/2003 | P | PART |
Carl Dependahl
|
|
|
ok to insulatemake correction ok. 8/6/2003 2:52:05 PM
|
BLD-Framing/Rough-in | 7/20/2003 | 7/21/2003 | 7/21/2003 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 7/20/2003 at 9:54:00 PM. Contact: ###-####....shear nailing ok, keep c/n re 2nd fl. joisting over stairs. 7/21/2003 11:03:43 AM
|
BLD-Conference | 7/18/2003 | 7/18/2003 | 7/18/2003 | P | PASS |
Carl Dependahl
|
|
|
RE FBI Joists...shear nailing ok , ok to side...obtain joist specs for rim area at frame insp 7/18/2003 5:00:46 PM
|
BLD-Wall cover | 7/17/2003 | 7/17/2003 | 7/17/2003 | P | FAIL |
Carl Dependahl
|
|
|
GREG..SHEAR WALL AND PANEL; Phone #: ###-#### Internet Inspection Request from: Dixie Fellows...c/n, need joist closure system specs (FBI joists) ...add blocks at osb joints, support landing over stairs 7/17/2003 5:04:57 PM
|
BLD-Foundation | 6/26/2003 | 6/27/2003 | 6/27/2003 | A | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 6/26/2003 at 3:10:52 PM. Contact: ###-####.
|
BLD-Footing | 6/25/2003 | 6/26/2003 | 6/26/2003 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 6/25/2003 at 12:44:40 PM. Contact: ###-####.
partial poured, wip 6/26/2003 2:32:43 PM
|