BLD-Final | 10/17/2003 | 10/20/2003 | 10/20/2003 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/17/2003 at 12:45:09 PM. Contact: ###-####.
|
BLD-Conference | 7/22/2003 | 7/23/2003 | 7/23/2003 | A | PART |
Tony Young
|
|
|
scheduled by tony,,, verify c/n final fixes
call john 1st 7/22/2003 2:13:20 PM
more venting needed 7/23/2003 12:24:06 PM
|
BLD-Energy code compliance | 7/23/2003 | 7/23/2003 | 7/23/2003 | P | PASS |
Tony Young
|
|
|
call john 1st at ###-####
|
BLD-Framing/Rough-in | 7/21/2003 | 7/22/2003 | 7/22/2003 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 7/21/2003 at 4:34:14 PM. Contact: ###-####.
wip on fixes, will re-schedule to verify 7/22/2003 2:27:26 PM
|
BLD-Energy code compliance | 7/17/2003 | 7/18/2003 | 7/18/2003 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 7/17/2003 at 2:57:12 PM. Contact: ###-####.
c/n posted,,, next time re-inspection fee will be imposed 7/18/2003 4:44:03 PM
|
BLD-Final | 7/15/2003 | 7/16/2003 | 7/16/2003 | A | NR |
Tony Young
|
|
|
JEFF; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 7/15/2003 | 7/16/2003 | 7/16/2003 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 7/15/2003 at 10:31:43 AM. Contact: ###-####.
need to hear from engineer on modified trusses 7/16/2003 12:44:33 PM
|
FIRE-Final Inspection | 7/15/2003 | 7/16/2003 | 7/16/2003 | A | CANC |
Rick Jackson
|
|
|
JEFF; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 7/14/2003 | 7/15/2003 | 7/15/2003 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 7/14/2003 at 12:37:58 PM. Contact: ###-####.
c/n posted, ok to insulate 7/15/2003 3:02:56 PM
|
BLD-Conference | 7/7/2003 | 7/7/2003 | 7/7/2003 | P | FAIL |
Carl Dependahl
|
|
|
re attic truss brg...add blocking or equal at cantilever brg, clips or ? for uplift resistance at opposite ends per eng'g. C/n issued...consult eng'r if beam added at porch. 7/7/2003 1:09:48 PM
|