BLD-Final | 8/26/2003 | 8/27/2003 | 8/27/2003 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/26/2003 at 3:00:09 PM. Contact: ###-####. C/C issued. 8/27/2003 11:31:54 AM
|
BLD-Wall cover | 6/15/2003 | 6/16/2003 | 6/16/2003 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/15/2003 at 10:32:25 PM. Contact: ###-####. ok to cover 6/16/2003 9:07:39 AM
|
BLD-Framing/Rough-in | 6/12/2003 | 6/12/2003 | 6/12/2003 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 6/12/2003 at 8:04:04 AM. Contact: ###-####. framing ok but,This need electrical approved and insulation in south wall insulated, contractor on site will recall. 6/12/2003 3:08:11 PM 6/12/2003 3:12:49 PM
|