BLD-Final | 12/22/2003 | 12/23/2003 | 12/23/2003 | P | PASS |
Jim Sly
|
|
|
ROD; Phone #: ###-#### Internet Inspection Request from: Darla Downs C/C issued. 12/23/2003 4:12:50 PM
|
BLD-Energy code compliance | 11/24/2003 | 11/26/2003 | 11/26/2003 | A | PASS |
Jim Sly
|
|
|
Rick; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Ustick....S on Mitchell.....R Sunflow...... 11/26/2003 9:53:18 AM
|
BLD-Framing/Rough-in | 11/21/2003 | 11/24/2003 | 11/24/2003 | P | PASS |
Jim Sly
|
|
|
rick; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Conference | 11/18/2003 | 11/19/2003 | 11/19/2003 | A | PASS |
Jim Sly
|
|
|
for duplex- rick; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Walk thru pre frame..... accessive deflection East wall. 11/19/2003 11:16:49 AM
|
BLD-Other | 11/10/2003 | 11/10/2003 | 11/10/2003 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/10/2003 at 7:35:02 AM. Contact: ###-####. 1st layer and fireblocking at (2) 1hr walls OK up to 8' 11/10/2003 3:07:14 PM
|
BLD-Foundation | 10/29/2003 | 10/29/2003 | 10/29/2003 | P | PASS |
Jim Sly
|
|
|
james; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Footing | 10/28/2003 | 10/28/2003 | 10/28/2003 | P | PART |
Jim Sly
|
|
|
james; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie appears OK 75% complete. 10/28/2003 2:09:42 PM
|