BLD-Final | 7/13/2004 | 7/13/2004 | 7/13/2004 | A | PASS |
Troy James
|
|
|
|
BLD-Grading Inspection | 7/13/2004 | 7/13/2004 | 7/13/2004 | | PASS |
|
|
|
Final grading and drainage approved
|
BLD-Final | 7/8/2004 | 7/9/2004 | 7/9/2004 | P | PART |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 7/8/2004 at 3:54:31 PM. Contact: ###-####. Need bond for landscaping or complete the landscaping. Need address numbers posted on house. Need to complete landing at exterior door of inlaw quarters. 7/9/2004 12:45:52 PM 7/9/2004 12:46:35 PM
|
BLD-Final | 6/24/2004 | 6/25/2004 | 6/25/2004 | P | FAIL |
Troy James
|
|
|
todd; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Need to post address sign, install smoke detector at hallway to bedrooms in basement, seal holes at exterior south of garage, install railing at garage and basement entry at rear of house. Temporary occ. ok.
6/25/2004 12:44:02 PM
|
BLD-Conference | 6/16/2004 | 6/17/2004 | 6/17/2004 | A | DONE |
Troy James
|
|
|
Todd; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes verify railing, guard requirements. 6/17/2004 11:56:25 AM
|
BLD-Energy code compliance | 12/31/2003 | 1/2/2004 | 1/2/2004 | P | PASS |
Steven Webb
|
|
|
dave Prior c/n items completed--ok to cover. 1/2/2004 2:39:27 PM
|
BLD-Framing/Rough-in | 12/24/2003 | 12/24/2003 | 12/24/2003 | P | FAIL |
Troy James
|
|
|
Randy; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
c/n posted ok to insulate walls only. 12/24/2003 2:44:56 PM
|
BLD-Framing/Rough-in | 12/23/2003 | 12/23/2003 | 12/23/2003 | P | FAIL |
Dave Hannah
|
|
|
Randy; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes needs fire blocking all furred out walls in basement under stairs ceilings of fireplaces ect needs truss engineering this was only a parcel framing 12/23/2003 1:42:21 PM
|
BLD-Framing/Rough-in | 11/13/2003 | 11/14/2003 | 11/14/2003 | P | PART |
Dave Hannah
|
|
|
john shear wall; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok to cover ext 11/14/2003 12:50:08 PM
|
BLD-Wall cover | 11/12/2003 | 11/13/2003 | 11/13/2003 | P | CANC |
Dave Hannah
|
|
|
John --- sheer; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes john nagale called to canc this inspection as it was not ready yet///dld 11-13-03 12:40 pm.
|
BLD-Wall cover | 10/29/2003 | 10/29/2003 | 10/29/2003 | P | FAIL |
Russ Owen
|
|
|
Bob
; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes posted c/n on back of garage wall. by job card went over all items with Bob. 10/28/2003 9:42:06 PM
|
BLD-Foundation | 10/1/2003 | 10/2/2003 | 10/2/2003 | A | PART |
Russ Owen
|
|
|
donny; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Footing | 9/29/2003 | 9/29/2003 | 9/29/2003 | P | PART |
Dave Hannah
|
|
|
donnie; Phone #: ###-#### Internet Inspection Request from: Barbara Moore garage ftg 9/29/2003 1:14:17 PM
|
BLD-Foundation | 8/28/2003 | 8/29/2003 | 8/29/2003 | A | PART |
Dave Hannah
|
|
|
donny; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
|
BLD-Footing | 8/11/2003 | 8/12/2003 | 8/12/2003 | A | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung basement ok to pour 8/12/2003 10:27:04 AM
|
BLD-Grading Inspection | 8/8/2003 | 8/8/2003 | 8/8/2003 | | PASS |
Rita DeYoung
|
|
|
garage footing subgrade has been approved by the geotechnical engineer
|