BLD-Final | 2/20/2004 | 2/23/2004 | 2/23/2004 | A | PASS |
Troy James
|
|
|
Justin, ###-####
|
BLD-Grading Inspection | 2/20/2004 | 2/20/2004 | 2/20/2004 | | BND |
Rita DeYoung
|
|
|
Bond has been submitted. Rough grading and drainage are complete. Fine grading, revegetation and restoration of the lots to the south and west must be bonded for. The engineer has recommended a $1,000.00 bond. Upon receipt of this bond the grading and drainage is conditionally approved.
|
BLD-Final | 2/17/2004 | 2/18/2004 | 2/18/2004 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 2/17/2004 at 9:46:55 PM. Contact: ###-####.
c/n posted 2/18/2004 3:49:40 PM
|
BLD-Energy code compliance | 10/13/2003 | 10/13/2003 | 10/13/2003 | P | PASS |
Dave Hannah
|
|
|
JUSTIN; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 10/9/2003 | 10/9/2003 | 10/9/2003 | P | PART |
Steven Webb
|
|
|
justin; Phone #: ###-#### Internet Inspection Request from: Darla Downs C/N posted--No ResCheck at time of inspection, provide at energy. Ext. Shear ok, Ok to insulate. 10/9/2003 3:36:25 PM
|
BLD-Framing/Rough-in | 10/8/2003 | 10/8/2003 | 10/8/2003 | P | CANC |
Dave Hannah
|
|
|
justin; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Foundation | 7/25/2003 | 7/28/2003 | 7/28/2003 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/25/2003 at 7:29:26 AM. Contact: ###-####. work in progress rebar in forms up 7/28/2003 11:20:03 AM
|
BLD-Footing | 7/18/2003 | 7/21/2003 | 7/21/2003 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/18/2003 at 8:21:35 AM. Contact: ###-####.
|
BLD-Footing | 7/18/2003 | 7/18/2003 | 7/18/2003 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/18/2003 at 7:58:26 AM. Contact: ###-####.
|
BLD-Grading Inspection | 7/18/2003 | 7/18/2003 | 7/18/2003 | | PASS |
Rita DeYoung
|
|
|
Footing subgrade has been approved by the geotechnical engineer
|