BLD-Final | 12/18/2003 | 12/19/2003 | 12/19/2003 | A | CANC |
Dave Hannah
|
|
|
Duane; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes out of time rescheduled for pm 12/19/2003 11:54:19 AM
|
BLD-Final | 12/19/2003 | 12/19/2003 | 12/19/2003 | P | PASS |
Dave Hannah
|
|
|
Duane; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Grading Inspection | 12/19/2003 | 12/19/2003 | 12/19/2003 | | PASS |
Rita DeYoung
|
|
|
Rough grading complete. Fine grading and revegetation are incomplete. For this the engineer has recommended a $500.00 bond. Upon submission of the bond the grading and drainage is conditionally approved.
|
BLD-Energy code compliance | 10/21/2003 | 10/22/2003 | 10/22/2003 | A | PASS |
Dave Hannah
|
|
|
DUANE; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok to cover 10/22/2003 8:49:56 AM
|
BLD-Framing/Rough-in | 10/20/2003 | 10/21/2003 | 10/21/2003 | P | PART |
Dave Hannah
|
|
|
duane; Phone #: ###-#### Internet Inspection Request from: Annette Moore framer on site working on c/nb items and insulators only about half complete 10/21/2003 1:15:31 PM
|
BLD-Framing/Rough-in | 10/17/2003 | 10/20/2003 | 10/20/2003 | A | FAIL |
Dave Hannah
|
|
|
duane; Phone #: ###-#### Internet Inspection Request from: Darla Downs c/n on site ok tyo inulate 10/20/2003 10:18:32 AM
|
BLD-Framing/Rough-in | 10/15/2003 | 10/16/2003 | 10/16/2003 | A | FAIL |
Steven Webb
|
|
|
duane shear please call 1/2 hr before going out ; Phone #: ###-#### Internet Inspection Request from: Darla Downs C/N posted--Do not insulate--air seal not completed at time of inspection. Other items need attention. 10/16/2003 9:57:41 AM
|
BLD-Framing/Rough-in | 10/6/2003 | 10/6/2003 | 10/6/2003 | P | PART |
Russ Owen
|
|
|
re-insp duane --letter in window addressing 6 straps & done--call 1st before insp -duane -###-####. Added straps to the exterior. as per engineering. 10/5/2003 11:05:10 PM
|
BLD-Framing/Rough-in | 10/2/2003 | 10/3/2003 | 10/3/2003 | A | CANC |
Russ Owen
|
|
|
duane sheer ; Phone #: ###-#### Internet Inspection Request from: Annette Moore allready done. 10/2/2003 9:36:37 PM
|
BLD-Framing/Rough-in | 9/30/2003 | 10/1/2003 | 10/1/2003 | A | PART |
Dave Hannah
|
|
|
shear only insp -dwayne ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok to cover ext 10/1/2003 9:15:58 AM
|
BLD-Conference | 9/29/2003 | 9/30/2003 | 9/30/2003 | A | DONE |
Dave Hannah
|
|
|
duane please call first; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Foundation | 8/21/2003 | 8/22/2003 | 8/22/2003 | A | PASS |
Dave Hannah
|
|
|
cal; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
|
BLD-Footing | 8/20/2003 | 8/21/2003 | 8/21/2003 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/20/2003 at 12:34:45 PM. Contact: ###-####.
|
BLD-Grading Inspection | 8/18/2003 | 8/18/2003 | 8/18/2003 | | PASS |
Rita DeYoung
|
|
|
Footing subgrade has been approved by the geotechnicl engineer.
|