BLD-Final | 11/11/2003 | 11/12/2003 | 11/12/2003 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/11/2003 at 8:27:48 AM. Contact: ###-####.
|
BLD-Grading Inspection | 11/10/2003 | 11/10/2003 | 11/10/2003 | | PASS |
Rita DeYoung
|
|
|
Final grading and drainage complete and approved
|
BLD-Energy code compliance | 9/23/2003 | 9/23/2003 | 9/23/2003 | P | FAIL |
Russ Owen
|
|
|
tony; Phone #: ###-#### Internet Inspection Request from: Darla Downs c/n posted 9/23/2003 4:43:35 PM
|
BLD-Framing/Rough-in | 9/18/2003 | 9/19/2003 | 9/19/2003 | A | CANC |
Dave Hannah
|
|
|
tony sheer nail; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
|
BLD-Framing/Rough-in | 9/18/2003 | 9/19/2003 | 9/19/2003 | A | FAIL |
Dave Hannah
|
|
|
JEFF ###-#### c/n on site ok to insulate 9/19/2003 1:09:45 PM
|
BLD-Framing/Rough-in | 9/12/2003 | 9/15/2003 | 9/15/2003 | A | FAIL |
Dave Hannah
|
|
|
RANDY SHEER NAIL; Phone #: ###-#### Internet Inspection Request from: Marc Lileks add staples at straps and retro hold down on back wall 9/15/2003 10:56:31 AM
|
BLD-Foundation | 7/30/2003 | 7/30/2003 | 7/30/2003 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/30/2003 at 7:56:13 AM. Contact: ###-####.
|
BLD-Grading Inspection | 7/23/2003 | 7/23/2003 | 7/23/2003 | | PASS |
Rita DeYoung
|
|
|
GEOTECHNICAL ENGINEER HAS APPROVED THE FOOTING SUBGRADE
|
BLD-Footing | 7/21/2003 | 7/22/2003 | 7/22/2003 | A | NR |
Dave Hannah
|
|
|
DAVE; Phone #: ###-#### Internet Inspection Request from: Dixie Fellows still no sign off from terry records 7/23/2003 11:16:11 AM
|
BLD-Footing | 7/21/2003 | 7/21/2003 | 7/21/2003 | P | CANC |
Dave Hannah
|
|
|
DAVE; Phone #: ###-#### Internet Inspection Request from: Dixie Fellows
|