BLD-Final | 11/25/2003 | 11/26/2003 | 11/26/2003 | A | NR |
Jim Sly
|
|
|
DAN; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Final | 11/26/2003 | 11/26/2003 | 11/26/2003 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/26/2003 at 8:50:39 AM. Contact: ###-####. OK for Perm Occ. :) 11/26/2003 3:13:37 PM
|
FIRE-Final Inspection | 11/26/2003 | 11/26/2003 | 11/26/2003 | A | PASS |
Troy Cobbley
|
|
|
fire life safety finaled
|
Permanent Occupancy | | 11/26/2003 | 11/26/2003 | | DONE |
|
|
|
|
BLD-Final | 10/23/2003 | 10/23/2003 | 10/23/2003 | P | PART |
Jim Sly
|
|
|
Darren; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes C/N Need Mech final (gas pipe) Need fire final to approve Access controlled Egress doors.....Obtain Perm Occ status within 90 days of this notice. OK For Temp Occ. 10/23/2003 1:31:50 PM
|
FIRE-Final Inspection | 10/22/2003 | 10/22/2003 | 10/22/2003 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with Sam Rogers permission until the fire alarm interface with the FM200 releaseing panel has been submitted and approved. Also the egress doors with the door magnets need to be tested when installation is complete
|
BLD-Framing/Rough-in | 9/29/2003 | 9/29/2003 | 9/29/2003 | P | PASS |
Jim Sly
|
|
|
darin ; Phone #: ###-#### Internet Inspection Request from: Annette Moore Ceiling OK. 9/29/2003 3:40:49 PM
|
BLD-Energy code compliance | 9/3/2003 | 9/8/2003 | 9/8/2003 | A | PASS |
Jim Sly
|
|
|
late afternoon please//darren; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 8/29/2003 | 9/2/2003 | 9/2/2003 | P | PASS |
Jim Sly
|
|
|
Late afternoon please//darren; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|