BLD-Final | 11/26/2003 | 11/26/2003 | 11/26/2003 | P | PASS |
Tony Young
|
|
|
Please call at least 30 mins in advance//dan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Final | 11/24/2003 | 11/25/2003 | 11/25/2003 | P | FAIL |
Tony Young
|
|
|
dan--call 1st before insp for access; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
need f/p pass, under floor issues 11/25/2003 2:44:05 PM
|
BLD-Grading Inspection | 11/20/2003 | 11/20/2003 | 11/20/2003 | | PASS |
Rita DeYoung
|
|
|
Final grading and drainage is approved.
|
BLD-Energy code compliance | 9/25/2003 | 9/26/2003 | 9/26/2003 | A | NR |
Tony Young
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Energy code compliance | 9/26/2003 | 9/26/2003 | 9/26/2003 | P | PASS |
Russ Owen
|
|
|
scott phone# ###-####
|
BLD-Framing/Rough-in | 9/25/2003 | 9/25/2003 | 9/25/2003 | P | PASS |
Tom Arcoraci
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 9/23/2003 | 9/24/2003 | 9/24/2003 | A | FAIL |
Tony Young
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie--please call 1st before insp
need trades 1st, also a fireplace permit, no inspection made 9/24/2003 3:04:50 PM
|
BLD-Framing/Rough-in | 9/24/2003 | 9/24/2003 | 9/24/2003 | P | NR |
Tony Young
|
|
|
double inspection 9/24/2003 3:09:40 PM
|
BLD-Foundation | 8/14/2003 | 8/15/2003 | 8/15/2003 | A | PART |
Carl Dependahl
|
|
|
early as possible//duane; Phone #: ###-#### Internet Inspection Request from: Barbara Moore... 8/15/2003 11:03:49 AM
|
BLD-Footing | 8/12/2003 | 8/13/2003 | 8/13/2003 | P | PART |
Russ Owen
|
|
|
dwayne; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Prior in-put was for another job. This job ok pending approval letter from soils engineer who contractor said was out on site after excavation and provided anew fondation detail for retaining wall footing and had them over dig west side. so it definatley appears soils engineer has been out. 8/13/2003 4:11:36 PM
|
BLD-Footing | 8/12/2003 | 8/13/2003 | 8/13/2003 | P | PART |
Russ Owen
|
|
|
dwayne; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. 80% complete at 11:30 pm, concrete and pump truck now on site. still needs engineers report for excavation, prior to pour as requested yesterday by inspector 415. told this to contractor at the site. 8/13/2003 12:24:47 PM
|
BLD-Foundation | 8/13/2003 | 8/13/2003 | 8/13/2003 | P | CANC |
Russ Owen
|
|
|
|
BLD-Grading Inspection | 8/13/2003 | 8/13/2003 | 8/13/2003 | | PASS |
Rita DeYoung
|
|
|
footing subgrade approved by geotechnical engineer
|