Permit Information
Permit NumberBLD03-01653
StatusFinaled
Name WASHINGTON TRUST BANK
Site Address 901 W BANNOCK ST
Project Name9TH & BANNOCK GARAGE
Customer Number 
ePlanReviewNo
Description
(WASHINGTON TRUST BANK - EXPANSION)(9TH & BANNOCK GARAGE-1ST FLR) New 3,052 sq. ft. expansion to an existing 4,800 sq.ft. bank tenant space with a 700 sq.ft. mezzanine in an existing building per approved plans on file. New total will be 7,852 sq. ft. Work to include miscellaneous interior demolition work, new interior walls, new interior doors and windows, replace exterior doors and windows at the sides of the recessed entry/exit, new suspended ceiling in the expansion area, interior finish, upgrading two restrooms to current accessibility standards, mechanical work, and electrical work. A new Certificate of Occupancy with the new area total and new occupant load total is to be issued when completed and approved. NOTE: This building is NOT fire sprinklered. (PC#0392-03) JCB
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/23/200310/24/200310/24/2003APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/23/2003 at 3:22:45 PM. Contact: ###-####. ok for occ 10/24/2003 11:24:27 AM
Permanent Occupancy 10/24/200310/24/2003 DONE
Details
FIRE-Final Inspection10/23/200310/23/200310/23/2003PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/23/2003 at 8:08:30 AM. Contact: ###-####. resubmittals will be available for the sttructural inspector to show changes to exits to the south 10/23/2003 3:39:54 PM
FIRE-Conference10/22/200310/22/200310/22/2003PPART
DetailsRick Jackson
met with Dennis about the exiting and how to make it work with using the door between the new and old office; after conferring with Jason Blais the architect will need to resubmit to allow the new tenant to exit to the south and to the north and to remove the exit signs at door between the new and old office; exit signs will be added to the south exit and remove signs on both sides of door to the east 10/22/2003 12:22:11 PM
BLD-Other10/10/200310/10/200310/10/2003APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/10/2003 at 6:39:29 AM. Contact: ###-####. ceiling grid needs to fix pods 10/10/2003 1:45:18 PM
BLD-Framing/Rough-in9/11/20039/11/20039/11/2003PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/11/2003 at 9:21:35 AM. Contact: ###-####. int office walls ok to cover 9/11/2003 1:53:06 PM