BLD-Final | 12/18/2003 | 12/18/2003 | 12/18/2003 | P | PASS |
Tony Young
|
|
|
Access is front door/ possible garage 4321 enter; Phone #: ###-#### Internet Inspection Request from: josh strasser
|
BLD-Grading Inspection | 12/18/2003 | 12/18/2003 | 12/18/2003 | | PASS |
Rita DeYoung
|
|
|
Final grading and drainage complete and approved.
|
BLD-Wall cover | 10/9/2003 | 10/10/2003 | 10/10/2003 | P | PASS |
Alan Hauser
|
|
|
RE- Int. shere; Phone #: ###-#### Internet Inspection Request from: josh strasser
|
BLD-Wall cover | 10/8/2003 | 10/9/2003 | 10/9/2003 | P | CANC |
Tony Young
|
|
|
Int. shere Re-inspection; Phone #: ###-#### Internet Inspection Request from: josh strasser Inspection cancelled from web by: josh strasser
|
BLD-Wall cover | 10/7/2003 | 10/8/2003 | 10/8/2003 | A | FAIL |
Tony Young
|
|
|
INT. Shere inspection; Phone #: ###-#### Internet Inspection Request from: josh strasser
c/n posted, not per plan 10/8/2003 10:30:26 AM
|
BLD-Energy code compliance | 9/29/2003 | 9/29/2003 | 9/29/2003 | P | PART |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 9/26/2003 | 9/29/2003 | 9/29/2003 | A | PASS |
Tony Young
|
|
|
Re- inspection @ insulation inspection; Phone #: ###-#### Internet Inspection Request from: josh strasser
|
BLD-Framing/Rough-in | 9/25/2003 | 9/25/2003 | 9/25/2003 | P | FAIL |
Tony Young
|
|
|
josh ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
c/n posted, ok to insaulate 9/25/2003 3:38:41 PM
|
BLD-Other | 9/15/2003 | 9/16/2003 | 9/16/2003 | A | CANC |
Jim Sly
|
|
|
Wanted sheer...previously passed by 415 9/16/2003 10:10:40 AM
|
BLD-Other | 9/15/2003 | 9/15/2003 | 9/15/2003 | P | CANC |
Tom Arcoraci
|
|
|
Exterior Shere; Phone #: ###-#### Internet Inspection Request from: josh strasser out of time 9/15/2003 5:30:15 PM
|
BLD-Framing/Rough-in | 9/5/2003 | 9/9/2003 | 9/9/2003 | A | PART |
Tony Young
|
|
|
I would like a sheer nailing inspection.
Thank You
Josh; Phone #: ###-#### Internet Inspection Request from: Josh Edwards
ext. shear ok 9/9/2003 11:21:12 AM
|
BLD-Foundation | 8/12/2003 | 8/12/2003 | 8/12/2003 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 8/12/2003 at 7:19:13 AM. Contact: ###-####. wip 8/12/2003 10:05:50 AM
|
BLD-Foundation | 8/12/2003 | 8/12/2003 | 8/12/2003 | P | CANC |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 8/12/2003 at 7:23:45 AM. Contact: ###-####. Inspection done by Inspector 420 in a.m. 8/12/2003 10:06:24 AM
|
BLD-Footing | 8/8/2003 | 8/8/2003 | 8/8/2003 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 8/8/2003 at 10:12:30 AM. Contact: ###-####.
|
BLD-Grading Inspection | 8/8/2003 | 8/8/2003 | 8/8/2003 | | PASS |
Rita DeYoung
|
|
|
Footing subgrade has been approved by the geotechnical engineer
|
BLD-Other | 8/7/2003 | 8/7/2003 | 8/7/2003 | P | CANC |
Tony Young
|
|
|
Need to get temp power pole inspected so I can get power hooked up to it.
Thanks; Phone #: ###-#### Internet Inspection Request from: Josh Edwards Inspection cancelled from web by: Josh Edwards
|