BLD-Final | 6/10/2004 | 6/11/2004 | 6/11/2004 | A | PASS |
Tony Young
|
|
|
Please confirm that driveway is completed so I can return the bond and call me. Thanks, Cathy ~
ok 6/11/2004 11:35:32 AM
|
BLD-Final | 5/27/2004 | 5/28/2004 | 5/28/2004 | P | PART |
Tom Arcoraci
|
|
|
bryan ; Phone #: ###-#### Internet Inspection Request from: Annette Moore needs driveway or bond ok for lc after that 5/28/2004 3:36:10 PM
|
BLD-Grading Inspection | 5/28/2004 | 5/28/2004 | 5/28/2004 | | PASS |
Rita DeYoung
|
|
|
Grading and drainage approved
|
FIRE-Final Inspection | 5/26/2004 | 5/28/2004 | 5/28/2004 | A | PASS |
Rick Jackson
|
|
|
brian-- ###-#### re-insp
|
FIRE-Final Inspection | 5/13/2004 | 5/13/2004 | 5/13/2004 | A | FAIL |
Rick Jackson
|
|
|
Smoke detector in guest room not interconnected with all smoke detectors 5/13/2004 8:21:46 AM
|
BLD-Conference | 5/3/2004 | 5/3/2004 | 5/3/2004 | P | PART |
Tony Young
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Annette Moore
on final requirements 5/3/2004 3:08:02 PM
|
BLD-Framing/Rough-in | 2/13/2004 | 2/13/2004 | 2/13/2004 | P | PASS |
Tony Young
|
|
|
Rob ###-####
energy ok also, so far 2/13/2004 4:28:38 PM
|
BLD-Energy code compliance | 1/28/2004 | 1/28/2004 | 1/28/2004 | P | PART |
Tony Young
|
|
|
rob--; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
ok to cover garage only, pending approval from fire inspector 1/28/2004 2:17:37 PM
|
BLD-Conference | 1/23/2004 | 1/23/2004 | 1/23/2004 | P | PART |
Tony Young
|
|
|
ROB; Phone #: ###-#### Internet Inspection Request from: Annette Moore
ok to insulate walls and tent over sprinkler lines 1/26/2004 9:04:34 AM
|
BLD-Framing/Rough-in | 1/21/2004 | 1/22/2004 | 1/22/2004 | A | FAIL |
Tony Young
|
|
|
rob; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
c/n posted,, need truss fixes,, need fire sprinklers signed off 1/22/2004 11:49:38 AM
|
BLD-Framing/Rough-in | 1/20/2004 | 1/20/2004 | 1/20/2004 | P | FAIL |
Troy James
|
|
|
rob; Phone #: ###-#### Internet Inspection Request from: Annette Moore
c/n posted need all bracing req. per Eng. 1/20/2004 2:59:20 PM
|
BLD-Framing/Rough-in | 12/4/2003 | 12/4/2003 | 12/4/2003 | P | PART |
Steven Webb
|
|
|
Rob; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Shear--Ok to cover exterior--c/n issued to provide eng. C/N posted by Inspector 415. 12/4/2003 4:32:03 PM
|
BLD-Framing/Rough-in | 12/4/2003 | 12/4/2003 | 12/4/2003 | P | PART |
Tony Young
|
|
|
Rob; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
ext. shear ok 12/4/2003 1:51:40 PM
|
BLD-Foundation | 10/29/2003 | 10/30/2003 | 10/30/2003 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 10/29/2003 at 5:34:14 PM. Contact: ###-####.
|
BLD-Foundation | 10/29/2003 | 10/31/2003 | 10/29/2003 | A | CANC |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/29/2003 at 5:04:05 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Oct 29 2003 5:33PM.
|
BLD-Footing | 10/23/2003 | 10/28/2003 | 10/28/2003 | A | PART |
Tony Young
|
|
|
rob; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
wip, ok 10/28/2003 11:21:49 AM
|
BLD-Grading Inspection | 10/28/2003 | 10/28/2003 | 10/28/2003 | | PASS |
Rita DeYoung
|
|
|
Footing subgrade approved by geotechnical engineer. However, 2 excavations south of the main residence foundations that will be for columns that support the roof in the patio area must have loose soil removed to expose undisturbed soil before the footings can be poured.
|
BLD-Footing | 10/23/2003 | 10/24/2003 | 10/24/2003 | A | NR |
Russ Owen
|
|
|
rob; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Needs ok for soil I called Terry R nothing submitted yet he call foundation contractor. 10/23/2003 5:55:02 PM
|