BLD-Final | 11/7/2003 | 11/10/2003 | 11/10/2003 | A | PASS |
Jim Storey
|
|
|
please call for access ###-#### scott
|
BLD-Wall cover | 8/21/2003 | 8/22/2003 | 8/22/2003 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 8/21/2003 at 3:19:13 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 8/19/2003 | 8/19/2003 | 8/19/2003 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 8/19/2003 at 9:26:47 AM. Contact: ###-####. Ok to insulate--ext. sided, siding door will be removed and a header installed to carry existing house trusses, this not done at time of inspection. 8/19/2003 2:06:42 PM
|
BLD-Framing/Rough-in | 8/14/2003 | 8/14/2003 | 8/14/2003 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/14/2003 at 9:40:52 AM. Contact: ###-####. 8/14/2003 1:54:47 PM needs elec permit and r/i also needs seal package done 8/14/2003 1:56:34 PM
|
BLD-Footing | 7/25/2003 | 7/25/2003 | 7/25/2003 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 7/25/2003 at 1:27:46 AM. Contact: ###-####. No plans on site, footing over dug with gravel fill ?, footing is not continous?.no provision for insulation?. talked with contractor on phone told him no plans do not pour. could not leave any c/n based on no plans not ready. 7/25/2003 10:55:45 AM
|
BLD-Footing | 7/25/2003 | 7/25/2003 | 7/25/2003 | P | PASS |
Jim Storey
|
|
|
mono pour rebar ok. 7/25/2003 2:43:07 PM
|