BLD-Final | 1/7/2004 | 1/8/2004 | 1/8/2004 | A | PASS |
Russ Owen
|
|
|
###-#### ramo
|
BLD-Final | 12/8/2003 | 12/9/2003 | 12/9/2003 | A | FAIL |
Russ Owen
|
|
|
posted c/n to have glass company provide listings etc for safety film on glass . alternate to safety glass. 12/9/2003 11:16:21 AM 12/9/2003 11:17:18 AM
|
BLD-Final | 12/4/2003 | 12/5/2003 | 12/5/2003 | P | FAIL |
Russ Owen
|
|
|
Remo ###-#### c/n safety glass at front door window. 12/5/2003 1:44:49 PM
|
BLD-Energy code compliance | 10/13/2003 | 10/13/2003 | 10/13/2003 | P | PASS |
Russ Owen
|
|
|
###-#### remo
|
BLD-Energy code compliance | 10/9/2003 | 10/9/2003 | 10/9/2003 | P | FAIL |
Russ Owen
|
|
|
c/n posted 10/9/2003 1:21:26 AM
|
BLD-Final | 10/8/2003 | 10/9/2003 | 10/9/2003 | A | PART |
Russ Owen
|
|
|
###-#### john framing not final , insulation c/n. 10/9/2003 1:07:23 AM
|
BLD-Final | 10/3/2003 | 10/6/2003 | 10/6/2003 | A | CANC |
Russ Owen
|
|
|
russ, you doc finaled this permit so i put it in for a final inspection *** please call first ***
|
BLD-Framing/Rough-in | 10/5/2003 | 10/6/2003 | 10/6/2003 | A | FAIL |
Russ Owen
|
|
|
posted c/n 10/5/2003 6:17:03 PM
|
BLD-Framing/Rough-in | 10/2/2003 | 10/3/2003 | 10/3/2003 | A | FAIL |
Tom Arcoraci
|
|
|
###-#### no app plans re insp fee 10/3/2003 9:25:12 AM
|
BLD-Framing/Rough-in | 9/30/2003 | 10/1/2003 | 10/1/2003 | A | FAIL |
Russ Owen
|
|
|
ramo ; Phone #: ###-#### Internet Inspection Request from: Annette Moore posted c/n needs plans, fire place,air seal package and also may need permit for addl sq and rear patio cover. contractor notified. 9/30/2003 9:56:34 PM
|
BLD-Foundation | 8/20/2003 | 8/21/2003 | 8/21/2003 | A | PART |
Russ Owen
|
|
|
BEN; Phone #: ###-#### Internet Inspection Request from: Darla Downs WIP. 8/21/2003 10:52:40 AM
|
BLD-Footing | 8/19/2003 | 8/20/2003 | 8/20/2003 | P | PART |
Russ Owen
|
|
|
MATT; Phone #: ###-#### Internet Inspection Request from: Darla Downs. Note 2 #4rebar shown on plans, foundation contractor called and was told by home owner not to put rebar in footings as shown on plan, I my-self just got of the phone and verified this with home owner , it is not a code requirement so I can not request it be in place. except at hold downs, whic contractor has garage wing walls per boise city details and wil place bar under hd's at other shown locations. 8/20/2003 3:28:41 PM
|