BLD-Final | 12/2/2004 | 12/3/2004 | 12/3/2004 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/2/2004 at 11:08:26 AM. Contact: ###-####.
|
BLD-Aging Inspection | 8/2/2004 | 8/2/2004 | 8/2/2004 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 8/2/2004 | 8/2/2004 | 8/2/2004 | | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 5/20/2004 | 5/20/2004 | 5/20/2004 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/20/2004 at 7:40:53 AM. Contact: ###-####. everything ok but for ADA REST ROOM SINK IS TO LOW AND NEED A TRANSFER SEAT IN SHOWER 5/20/2004 4:28:16 PM
|
FIRE-Final Inspection | 5/19/2004 | 5/19/2004 | 5/19/2004 | A | PASS |
Rick Jackson
|
|
|
|
BLD-Final | 5/17/2004 | 5/17/2004 | 5/17/2004 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/17/2004 at 11:00:57 AM. Contact: ###-####.
|
FIRE-Final Inspection | 5/17/2004 | 5/17/2004 | 5/17/2004 | P | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 5/17/2004 at 11:00:21 AM. Contact: ###-####.
|
BLD-Final | 5/10/2004 | 5/11/2004 | 5/11/2004 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/10/2004 at 2:27:50 PM. Contact: ###-####.
|
BLD-Final | 5/7/2004 | 5/10/2004 | 5/10/2004 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/7/2004 at 8:51:19 AM. Contact: ###-####.
|
BLD-Final | 5/10/2004 | 5/10/2004 | 5/10/2004 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/7/2004 at 8:51:19 AM. Contact: ###-####.needs other trades to sign off 5/10/2004 3:38:44 PM
|
BLD-Framing/Rough-in | 4/21/2004 | 4/22/2004 | 4/22/2004 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/21/2004 at 7:21:07 AM. Contact: ###-####.1hr wall north side of corr ok and rooms on north side ok for ceiling grid after other trades sign off 4/22/2004 11:21:58 AM
|
BLD-Aging Inspection | 2/10/2004 | 2/10/2004 | 2/10/2004 | | DONE |
Dave Hannah
|
|
|
wip 2/10/2004 12:18:52 PM
|