FIRE-Conference | 8/25/2003 | 8/26/2003 | 8/26/2003 | A | PASS |
Jim Sly
|
|
|
ibraahim; Phone #: ###-#### Internet Inspection Request from: Marc Lileks Should have been Struct Final....Final Pass. 8/26/2003 10:06:42 AM
|
BLD-Final | 8/22/2003 | 8/25/2003 | 8/25/2003 | P | FAIL |
Jim Sly
|
|
|
IBRAHIM; Phone #: ###-#### Internet Inspection Request from: Darla Downs NR....still need Plumb. final. 8/25/2003 2:10:50 PM
|
BLD-Framing/Rough-in | 8/21/2003 | 8/22/2003 | 8/22/2003 | A | NR |
Jim Sly
|
|
|
senale--###-####
|
BLD-Framing/Rough-in | 8/22/2003 | 8/22/2003 | 8/22/2003 | P | PASS |
Jim Sly
|
|
|
sanella per Jim sly ; Phone #: ###-#### Internet Inspection Request from: Annette Moore 8/22/2003 3:15:57 PM Frame OK Pending Plumb R/I appr. 8/22/2003 4:19:37 PM
|
BLD-Framing/Rough-in | 8/20/2003 | 8/20/2003 | 8/20/2003 | P | NR |
Jim Sly
|
|
|
sanela; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Asked if Plumb permit obtained....No (need one). 8/20/2003 4:25:58 PM
|