BLD-Final | 7/23/2004 | 7/23/2004 | 7/23/2004 | P | PASS |
Troy James
|
|
|
doug; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Final | 7/21/2004 | 7/21/2004 | 7/21/2004 | P | FAIL |
Troy James
|
|
|
douglas; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Need address numbers posted on house. Need max 73/4" rise to front porch at landing. Temporary OCC. ok. 7/21/2004 1:28:56 PM
|
BLD-Final | 7/19/2004 | 7/20/2004 | 7/20/2004 | P | CANC |
Troy James
|
|
|
doug; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Any energy related issues please contact Bob Archibald @ ###-####.
|
BLD-Grading Inspection | 7/14/2004 | 7/14/2004 | 7/14/2004 | | PASS |
|
|
|
Final grading and drainage approved
|
BLD-Energy code compliance | 2/24/2004 | 2/24/2004 | 2/24/2004 | P | PASS |
Troy James
|
|
|
DOUG; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Conference | 2/19/2004 | 2/19/2004 | 2/19/2004 | P | PASS |
Bob Archibald
|
|
|
Width of upper stairs ok at finished width of 31.5 inches.
|
BLD-Energy code compliance | 2/18/2004 | 2/18/2004 | 2/18/2004 | P | PART |
Tony Young
|
|
|
doug please call; Phone #: ###-#### Internet Inspection Request from: Annette Moore
c/n posted, stairs, fireblocking, exhaust in garage 2/18/2004 3:37:59 PM
|
BLD-Conference | 1/27/2004 | 1/27/2004 | 1/27/2004 | P | PART |
Bob Archibald
|
|
|
Conference with Doug on energy code requirements. Doug will resubmit new res-check for proposed changes.
|
BLD-Framing/Rough-in | 1/26/2004 | 1/27/2004 | 1/27/2004 | P | PASS |
Tom Arcoraci
|
|
|
Tony....please co-ordinate your inspection with Bob Archibald///###-#### doug
|
BLD-Framing/Rough-in | 1/13/2004 | 1/14/2004 | 1/14/2004 | A | PART |
Tony Young
|
|
|
doug; Phone #: ###-#### Internet Inspection Request from: Annette Moore
ext shear ok w/ engineer letter 1/14/2004 10:14:13 AM
|
BLD-Framing/Rough-in | 12/23/2003 | 12/23/2003 | 12/23/2003 | P | FAIL |
Tony Young
|
|
|
doug; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie--shear wall
shear inspection,,,, need engineer to provide letter of compliance on shear as built due to changes,,, nail panels per plan 12/23/2003 3:15:30 PM
|
BLD-Foundation | 10/8/2003 | 10/9/2003 | 10/9/2003 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/8/2003 at 9:07:01 PM. Contact: ###-####.
wip 10/9/2003 1:22:51 PM
|
BLD-Footing | 10/7/2003 | 10/7/2003 | 10/7/2003 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 10/7/2003 at 7:15:21 AM. Contact: ###-####. WIP--85% ready at time of inspection--Not all rebar in place--Ok to pour after installing all rebar per plan. 10/7/2003 1:13:13 PM
|
BLD-Footing | 10/2/2003 | 10/6/2003 | 10/6/2003 | P | CANC |
Tony Young
|
|
|
ft doug joseph-- ###-#### call 1st before insp doug called to canc this inspection as it was not ready yet...dld
|
BLD-Grading Inspection | 10/6/2003 | 10/6/2003 | 10/6/2003 | | PASS |
Rita DeYoung
|
|
|
Footing subgrade has been approved by the geotechnical engineer
|